We are glad to announce that Mercados – Aries International have been engaged to deliver a Grid Impact Study (GIS) required for a 240 MW Wind Farm project in Azerbajian. The scope of the project is to perform electrical studies for the connection of a total of 240 MW of wind generation divided in two plants: 138MW connected at Pirakushkul (110KV) and 102MW connected at Khizi (110kV). We are glad to support our Client and Azerbajian for the development of Sustainable Energy. Our Head of Consultancy German Nieto shall be in charge of the engagement.