Bosnia and Herzegovina |
Owner's Engineer for the Construction of Bileca 60 MWp PV Power Plant in BiH |
EFT Trade d.o.o |
ongoing |
Energy |
Small |
Europe |
Bulgaria |
Feasibility Study for Dobrudzha Hybrid Project in Bulgaria |
Sunterra Renewable Energy |
ongoing |
Energy |
Small |
Europe |
Spain |
Owner's Engineer for PV Plants in Spain: Pitarco and Titan Batch 1 (Alcazar I&II, Manzanares, Perea & Vegon) |
Galp Energia S.A. |
ongoing |
Energy |
Small |
Europe |
Spain |
Lenders? Technical Advisor Services for La Guardia 49 MW PV Project in Spain |
Opd energy |
ongoing |
Energy |
Medium |
Europe |
Spain |
Lender's Technical Advisor for Cañada Alta PV Project in Spain |
SolarPack |
ongoing |
Energy |
Small |
Europe |
Spain |
Revisión modificaciones de 9 EDAR's Andalucia |
Aquatec Proyectos para el Sector del Agua |
ongoing |
Energy |
Medium |
Europe |
Spain |
Assistance in the rehabilitation works of ETAP TER |
AQUAMBIENTE |
ongoing |
Water |
Medium |
Europe |
Spain |
ETAP la estrella - revision obras de emergencia |
AQUAMBIENTE |
ongoing |
Water |
Medium |
Europe |
Spain |
Review of the rate of a Treatment Plant in the Community of La Sagra Alta (Toledo) |
Mancomunidad Sagra Alga |
ongoing |
Water |
Medium |
Europe |
Multi-country |
CESEC’s region potential for renewable and low-carbon gas deployment in the context of infrastructure development |
European Commission |
ongoing |
Management Consulting |
Small |
Europe |
Slovenia |
Trafoflex R&D project |
SODO |
ongoing |
Management Consulting |
Small |
Europe |
Spain |
Owner's Engineer for PV PLANT TITAN BATCH 1 in Spain |
Private Entity |
ongoing |
Energy |
Small |
Europe |
Spain |
PV-LTA: Lender’s Technical Advisor for a PV Portfolio (Proyecto Helios) in Spain |
Private Entity |
ongoing |
Energy |
Medium |
Europe |
Spain |
Lenders Technical Advisory Services for 2x5 MW Solar Photovoltaic Projects (GFV I & II) in Spain |
Private Entity |
ongoing |
Energy |
Small |
Europe |
Ukraine |
Development and delivery of a comprehensive training program and on-line self-assessment tool for gas traders |
USAID |
ongoing |
Management Consulting |
Small |
Europe |
Ukraine |
UESP Electricity & Gas Studies |
USAID |
ongoing |
Management Consulting |
Small |
Europe |
Spain |
Revision de plano de planos de las edares de Fuentesauco, La Matilla y Maderuelo |
MAREA |
2024 |
Water |
Medium |
Europe |
Belgium |
CESEC's region potential for renewable and low-carbon gas deployment in the context of infrastructure development |
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY |
2023 |
Management Consulting |
Small |
Europe |
Ireland |
Solar Resource Assessments for 9 PV Projects (283.1 MWp) in Ireland |
Power Capital Renewable Energy |
2023 |
Energy |
Small |
Europe |
Spain |
Environmental processing of the photovoltaic solar plant Zamora Solar 1, in the municipality of Toro (Zamora) |
FOTOWATIO RENEWABLE VENTURES |
2023 |
Environment |
Small |
Europe |
Spain |
CONSTRUCTABILITY CHECK EL REFUGIO Y PRADO GRIS |
Statkraft Energi As |
2023 |
Energy |
Small |
Europe |
Spain |
CONSTRUCTABILITY CHECK OF PROJECT L/220KV SC SE FAUSITA SOLAR - MURCIA |
Statkraft Energi As |
2023 |
Energy |
Small |
Europe |
Spain |
CONSTRUCTABILITY CHECK PINEA |
Statkraft Energi As |
2023 |
Energy |
Medium |
Europe |
Spain |
CONSTRUCTABILITY CHECK EL CASAR |
Statkraft Energi As |
2023 |
Energy |
Medium |
Europe |
Spain |
Environmental Impact Assessment and Integrated Environmental Authorization of a 49.9 MWe biomass-based electric power generation plant in the TM of Guardo (Palencia). Modification and processing. |
Forestalia Renovables S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
IMPACT ASSESSMENT AND INTEGRATED ENVIRONMENTAL AUTHORIZATION OF A 49.5 MWe BIOMASS POWER GENERATION PLANT IN THE TM OF ZUERA |
Forestalia Renovables S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
STUDY AND CALCULATION FOR DIFFERENT LINES |
COBRA INSTALACIONES Y SERVICIOS |
2023 |
Energy |
Small |
Europe |
Spain |
Environmental Risk Analysis of a composting plant in the Villanueva de la Cañada tm (Madrid) |
Veolia France |
2023 |
Environment |
Small |
Europe |
Spain |
Technical services of permitting process for two wind farms (ANOIA I and SEGARRA II & ANOIA I and SEGARRA III) and their evacuation electrical line in Catalonia (Spain) |
RP Global Spain Operations |
2023 |
Environment |
Small |
Europe |
Spain |
O&M Report on flooding in Ictio Alcazar PV Project in Spain |
Galp Energia S.A. |
2023 |
Energy |
Small |
Europe |
Spain |
WIND-TA: FORNAX I, II , III Wind Hybridation Advisory Services |
Galp Energia S.A. |
2023 |
Energy |
Small |
Europe |
Spain |
HIGH VOLTAGE AERIAL LINE 400 KV SE CASTEJÓN |
AYESA |
2023 |
Energy |
Small |
Europe |
Spain |
Construction project for the new WWTP of Silvouta and Adendum 06/23 (SANTIAGO DE COMPOSTELA) |
GS INIMA - Spain |
2023 |
Water |
Medium |
Europe |
Spain |
Study of cumulative and synergistic effects at the Mudarra 400 junction (Valladolid). Modification of positions and wind turbine model |
ABEI ENERGY |
2023 |
Environment |
Medium |
Europe |
Spain |
Reconnaissance visit and identification of vegetation units in the plots of implementation of the PSFV Muelas project and evacuation infrastructures |
ABEI ENERGY |
2023 |
Environment |
Medium |
Europe |
Spain |
Insubstantial Modification Report of the "Mudarra" wind farm project |
ABEI ENERGY |
2023 |
Environment |
Medium |
Europe |
Spain |
Basic Engineering of the water facilities of the Hydrogen Plant in Villamuriel (Palencia) |
Univergy |
2023 |
Water |
Medium |
Europe |
Spain |
Estudio Técnico de EDARi ENCE NAVIA |
FCC AQUALIA |
2023 |
Water |
Small |
Europe |
Spain |
PROJECT L/400 KV 5C PHOTOVOLTAIC EVACUATION |
IDOM |
2023 |
Energy |
Small |
Europe |
Spain |
PROJECTS FOR AAC PSF AND HIGH VOLTAGE LINE EVACUATION NUDO VILLAVICIOSA |
Solaria |
2023 |
Energy |
Small |
Europe |
Spain |
Framework contract to carry out pre-feasibility studies for wind projects and their evacuation lines: QUEREÑO project (León) |
VESTAS Spain |
2023 |
Environment |
Small |
Europe |
Spain |
PRE-FEASIBILITY STUDIES FOR THE DEVELOPMENT OF 4 WIND PROJECTS (VILLAQUIRÁN, SUSINOS, CARDALES AND HORMACILLAS) IN BURGOS |
VESTAS Spain |
2023 |
Environment |
Medium |
Europe |
Spain |
Modelling of CSP Plants in Spain using SAM_v.2021.12.2 |
SAETA Yield |
2023 |
Water |
Large - Multiannual |
Europe |
Spain |
Initiation Documents for the FFVV+BSS Hybridizations in the PPEE of Sasamon, Estépar, Manciles I and Manciles II, in the province of Burgos. |
GAMESA |
2023 |
Environment |
Large - Multiannual |
Europe |
Spain |
HIGH VOLTAGE AERIAL LINE 220 kV SET Guadalsolar - SET Mirabal |
Texla Renovables |
2023 |
Energy |
Small |
Europe |
Spain |
MODIFICATION OF HIGH VOLTAGE 220 kV AERIAL LINE SIMPLE CIRCUIT INTERCONNECTION OF PHOTOVOLTAIC SOLAR PARK WITH 220 kV SUBSTATION MONTEARENAS |
Texla Renovables |
2023 |
Energy |
Medium |
Europe |
Spain |
Memoria valorada ETAP Sierra Boyera |
Aquatec Proyectos para el Sector del Agua |
2023 |
Water |
Medium |
Europe |
Spain |
Technical Study of 10 WWTPs in Andalucia. |
Aquatec Proyectos para el Sector del Agua |
2023 |
Water |
Medium |
Europe |
Spain |
Study of Alternative WTP Conquero - Huelva |
Aquatec Proyectos para el Sector del Agua |
2023 |
Water |
Medium |
Europe |
Spain |
Technical Advisory Services for Hybridization Projects with Wind Power and Battery Energy Storage Systems in Spain |
GALP New Energies, S.A. |
2023 |
Energy |
Medium |
Europe |
Spain |
Analysis and elaboration of the descriptive report related to the elaboration of an Energy Saving Plan |
OHLA Progress Enablers |
2023 |
Energy |
Small |
Europe |
Spain |
Alternative Study 6 WTP Huelva: The 6 WTPs to be evaluated are: Sanlucar, San Silvestre, Lepe, Aljaraque, Tinto and Condado. |
Giahsa - GESTION INTEGRAL DEL AGUA DE HUELVA SA |
2023 |
Water |
Small |
Europe |
Spain |
CHECKING TOWER HIGH VOLTAGE LINE 220 KV SC CNT - GUI SECTION 14-16 |
SERTOGAL S.L. |
2023 |
Energy |
Large |
Europe |
Spain |
L/15 kV ISLA CRISTINA - LEPE |
VP INGENIERÍA S.L. |
2023 |
Energy |
Medium |
Europe |
Spain |
EVACUATION LINES FOR EPC TENDER SPECIFICATIONS |
VP INGENIERÍA S.L. |
2023 |
Energy |
Medium |
Europe |
Spain |
EPC TENDER PROJECTS |
VP INGENIERÍA S.L. |
2023 |
Energy |
Medium |
Europe |
Spain |
Simplified environmental impact assessment of a biomethane production plant from WWTP sludge for injection into the network in Cabezón de Pisuerga, Valladolid |
Sociedad Pública de Medio Ambiente de Castilla y León (SOMACyL) |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental Impact Assessment of the new domestic waste dump in the province of Segovia |
Sociedad Pública de Medio Ambiente de Castilla y León (SOMACyL) |
2023 |
Environment |
Medium |
Europe |
Spain |
Preparation of the application for modification of the authorization of the non-hazardous municipal and industrial waste landfill of Abajas |
Sociedad Pública de Medio Ambiente de Castilla y León (SOMACyL) |
2023 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Evaluation by the ordinary procedure of the "Regional Plan of Territorial Scope for the expansion of the Technological Park of León" |
TRIGONO CONSULTORES S.L. |
2023 |
Environment |
Medium |
Europe |
Spain |
Integrated environmental authorization procedure of a biogas production plant, in TM de Olmedo (Valladolid) |
VALORIZACIONES Y RECUPERACIONES ENERGÉTICAS, S.L. |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental Impact Study and Complementary Studies of two 50MW Solar Plants in Palacios de Sanabria (ZA) |
VIGIERS PLUS PROJECT, S.L.U. |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental feasibility study for a photovoltaic project in the Municipalities of Aguiilar de Campoo and Cervera de Pisuerga (Palencia) |
Viridi Energías Renovables España, S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Fauna study of the Santico I, II and III photovoltaic plants in the province of Zamora and its evacuation power line with connection to SET Santiz (Salamanca) |
Viridi Energías Renovables España, S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "Corralnuevo" wind farm (Extension 2) |
WPD Parque Eólico Corralnuevo, S.L.U. |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "El Poleo" wind farm (Extension 2) |
WPD PARQUE EÓLICO EL POLEO S.L.U. |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Monitoring Plan in the exploitation phase of the "Panaderas" wind farm (Extension 2) |
WPD PARQUE EÓLICO LAS PANADERAS S.L.U. |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "Navillas" wind farm (Extension 2) |
WPD Parque Eólico Navillas S.L.U. |
2023 |
Environment |
Small |
Europe |
Spain |
Study of Synergistic and Cumulative Effects for the processing of the "MEDINA" PSF of 22 MW and evacuation infrastructures in the TM of Medina del Campo (Valladolid province) |
YOUTALL CAPITAL, S.L |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance Plan for the works of the "Zaratán I y II" Solar Plant in Ciguñuela and Zaratán (Valladolid) |
ZURVAN GESTION DE PROYECTOS SL |
2023 |
Environment |
Small |
Europe |
Spain |
TOPOGRAPHY 2 UNDERGROUND HIGH VOLTAGE LINE 132 KV AND A PLOT IN TABERNAS |
EDIP SERVICIOS INDUSTRIALES S.L. |
2023 |
Energy |
Medium |
Europe |
Spain |
CONSTRUCTION OF 220/33KV SUBSTATION IN IFAKARA & 70KM EXTENSION DISTRIBUTION P. LINES (TANZANIA) |
AEE POWER EPC S.A.U. |
2023 |
Energy |
Large - Multiannual |
Europe |
Spain |
45KV HIGH VOLTAGE AREA/UNDERGROUND LITHIUM FACTORY FOR 45MW PSF ARCO I EVACUATION |
ALTER ENERSUN S.A. |
2023 |
Energy |
Small |
Europe |
Spain |
FEASIBILITY, TECHNICAL, ECONOMIC, FINANCIAL AND ENVIRONMENTAL STUDIES OF THE AMARATECA - TALANGA TRANSMISSION LINE PROJECT - 43.5 KM 230 KV |
BANCO CENTROAMERICANO DE INTEGRACION ECONOMICA |
2023 |
Energy |
Small |
Europe |
Spain |
FEASIBILITY, TECHNICAL, ECONOMIC, FINANCIAL AND ENVIRONMENTAL STUDIES OF THE PRADOS TRANSMISSION LINE PROJECT - AGUA CALIENTE - 43.5 KM 230 KV |
BANCO CENTROAMERICANO DE INTEGRACION ECONOMICA |
2023 |
Energy |
Medium |
Europe |
Spain |
FEASIBILITY, TECHNICAL, ECONOMIC, FINANCIAL AND ENVIRONMENTAL STUDIES OF THE LA ENTRADA - SANTA ROSA TRANSMISSION LINE PROJECT - 43.5 KM 230 KV |
BANCO CENTROAMERICANO DE INTEGRACION ECONOMICA |
2023 |
Energy |
Medium |
Europe |
Spain |
LSAMT 20 KV ALMONTE PROJECT |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2023 |
Energy |
Medium |
Europe |
Spain |
GUADACORTE UNDERGROUND MV LINE PROJECT |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2023 |
Energy |
Confidential |
Europe |
Spain |
MODIFICATION OF LMT PROJECT 15 KV EVACUATION PV 5,586 MW IN HUEVAR DEL ALJARAFE (SEVILLA) |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2023 |
Energy |
Small |
Europe |
Spain |
EPC PV MARCHENILLA |
CONSERVACIÓN ASFALTO Y CONSTRUCCIÓN S.A.U. |
2023 |
Energy |
Small |
Europe |
Spain |
Execution Project LAAT 66kV ETS Alcon - ETS Puebla |
ENITEC ELECTRIC S.L. |
2023 |
Energy |
Small |
Europe |
Spain |
Study with PLS of the Duero crossing and the Adif crossing |
INTERTEK IBÉRICA SPAIN S.L.U. |
2023 |
Energy |
Small |
Europe |
Spain |
UNDERGROUND LINE 132 kV Bustatur |
ISASTUR INGENIERÍA S.A. |
2023 |
Energy |
Medium |
Europe |
Spain |
AMBAR. CALCULATION OF DIFFERENT SUBTERRANEAN LINES |
ISASTUR INGENIERÍA S.A. |
2023 |
Energy |
Small |
Europe |
Spain |
ELECTROMECHANICAL ASSEMBLY OF CAMPOFRIO SUBSTATION |
OCAMI MONTAJES INDUSTRIALES S.L. |
2023 |
Energy |
Medium |
Europe |
Spain |
400 kV HIGH VOLTAGE AERIAL LINE MAGDA SUBSTATION - 53 km LA PLANA SUBSTATION and 132 kV HIGH VOLTAGE AERIAL LINE LES COVES SUBSTATION - 4 KM AND 103 MW MAGDA SUBSTATION |
PREMIER ENGINEERING AND PROCUREMENT |
2023 |
Energy |
Medium |
Europe |
Spain |
HIGH VOLTAGE LINE 30 KV SX/DX "SET PSF TALAYUELA II"-"SET TALAYUELA SOLAR" |
SISTEM MELESUR ENERGÍA S.A. |
2023 |
Energy |
Medium |
Europe |
Spain |
Technical assistance in the review of the AAI, regarding its adaptation to the Best Available Techniques of a Domestic Waste Treatment Center, located in the municipality of Abajas (Burgos) |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2023 |
Environment |
Medium |
Europe |
Spain |
Request for authorization of Exceptional Use of Rural Land, to the Duero Hydrographic Confederation and the Territorial Environment Service for the construction of the LAT 132 kV |
Evacuación Tordesillas 400 kV, S.L |
2023 |
Environment |
Small |
Europe |
Spain |
Technical Assistance for the Substantial Modification of the Integrated Environmental Authorization of a hazardous waste manager in S. Esteban de Gormaz (Soria) |
EXIDE TECHNOLOGIES, S.L.U |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Monitoring Programs for the 132 kV Evacuation Power Line of the La Lora I and La Lora II Wind Farms in Burgos. exploitation phase |
Exus Management Partners, S.L |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance Program for the "Cuesta Mañera", "La Muñeca" and "Alconada" wind farms, in the MT of AMPUDIA (Palencia). exploitation phase |
Exus Management Partners, S.L |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental Monitoring Programs for the 132 kV "Lodoso" and "Marmellar" Evacuation Power Line to the "La Coculina" SET in Burgos. exploitation phase |
Exus Management Partners, S.L |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental monitoring and surveillance plans in the exploitation phase of the Wind Farms: Arroyal, Perul, Lastra. Lodoso, Sargentes, Lora I and Lora II (Burgos) |
Exus Management Partners, S.L |
2023 |
Environment |
Small |
Europe |
Spain |
Assistance in the Simplified Environmental Impact Assessment of a biopharmaceutical production industry in León |
GH GENHELIX S.A. |
2023 |
Environment |
Small |
Europe |
Spain |
Request for Authorization for Exceptional Use of Rustic Land for the "Hanto Solar" photovoltaic solar plant project and its evacuation infrastructures in the municipalities of Robleda-Cervantes and Palacios de Sanabria (Zamora province). |
Green Genius |
2023 |
Environment |
Medium |
Europe |
Spain |
Technical assistance for the modification of the electrical line project of the PFV Hanto Solar in several TT.MM. from Zamora |
Green Genius |
2023 |
Environment |
Small |
Europe |
Spain |
Processing of the environmental evaluation of the 15 MW photovoltaic solar plant and its evacuation infrastructure located in the Municipality of Robleda, province of Zamora |
Green Genius |
2023 |
Environment |
Small |
Europe |
Spain |
Processing of the Environmental Assessment of a photovoltaic solar plant at Nudo Valdecarretas 400 in the province of Zamora (Castilla y León) |
Green RIC Energy, S.L |
2023 |
Environment |
Medium |
Europe |
Spain |
Processing of the environmental evaluation of the common evacuation infrastructures of 4 photovoltaic solar plants located in the northern area of Nudo Valdecarretas 400 in the province of Zamora (Castilla y León) |
Green RIC Energy, S.L |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental Technical Assistance to a manager of hazardous and non-hazardous waste in the province of Segovia |
HERMANOS CRIADO PASCUAL, C.B. |
2023 |
Environment |
Small |
Europe |
Spain |
Environmental Technical Assistance for the processing of the AAP of the Tordesillas II photovoltaic plant in the TM of Tordesillas (Valladolid) |
HYP Renewables Spain, S.L. |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental legislative update of IKEA Ibérica centers 2022-23 |
IKEA Ibérica S.A. |
2023 |
Environment |
Small |
Europe |
Spain |
Assistance for the design and implementation of an environmental management system according to ISO 14001 in an engineering office in Valladolid |
INCIDEC, S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Update service on environmental regulations applicable to a biotechnology industry in León |
4D Pharma León S.L.U |
2023 |
Environment |
Medium |
Europe |
Spain |
Avifauna and Chiroptera studies for the "Loma de la Cuesta Quemada" wind farm in the municipality of Medina de Pomar (Burgos) |
ALFANAR ENERGÍA ESPAÑA S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the communication of the start of activity of a pharmaceutical industry in the province of Valladolid |
BDI - BIOTECHNOLOGY DEVELOPMENT FOR INDUSTRY IN PHARMACEUTICALS, S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Report for non-substantial modification of the AAI, consisting of the request for declaration of End of Condition of Waste of the PAVAL produced in the facilities of BEFESA ALUMINIO, SL, located in Valladolid |
BEFESA ALUMINIO S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Preparation of a Landscape Integration Study for the photovoltaic solar plant "EL LLANO" in the TM of Casalarreina (La Rioja) |
BOREAS TECNOLOGÍA, S.L |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental impact study of the Cerro Airo wind farm (Cantabria) |
BOREAS TECNOLOGÍA, S.L |
2023 |
Environment |
Large - Multiannual |
Europe |
Spain |
Preliminary studies and environmental impact assessment for the development of the 130 MW "Pisuerga" wind farm in the province of Palencia, and its evacuation line - FAUNA |
BOREAS TECNOLOGÍA, S.L |
2023 |
Environment |
Small |
Europe |
Spain |
TECHNICAL ASSISTANCE FOR THE PROCESSING OF THE SUBSTANTIAL MODIFICATION OF THE INTEGRATED ENVIRONMENTAL AUTHORIZATION OF THE WASTE TREATMENT AND DISPOSAL CENTER IN THE MUNICIPALITY OF SANTOVENIA DE PISUERGA (VALLADOLID). ALLEGATIONS |
Centro de Transferencias, S.A. (Cetransa) |
2023 |
Environment |
Medium |
Europe |
Spain |
Technical Assistance for the extension of the Authorization of a Manager of Hazardous and Non-Hazardous Waste in the municipality of Villamuriel de Cerrato (Palencia) |
CHATELAC, S.L. |
2023 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the integration of environmental issues in the urbanization and infrastructure projects of Madrid Nuevo Norte. Phase 2 |
Crea Madrid Nuevo Norte, S.A. (CreaMNN) |
2023 |
Environment |
Medium |
Europe |
Spain |
Report for the non-substantial environmental modification of the 132 kV line and the SET Valdecarretas Norte 30/132 kV in the TM of Toro (Zamora) |
Monte Reina Renovables SL |
2023 |
Environment |
Small |
Europe |
Spain |
Modification No. 13 of the Municipal Urban Regulations of Rueda (Valladolid): BODEGAS DE Herederos de Marqués de Riscal. |
Planz Planeamiento Urbanístico SLP |
2023 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document of the Regional Project for the expansion of the "Los Hitares" Industrial Estate in Bernuy de Porreros (Segovia) |
Planz Planeamiento Urbanístico SLP |
2023 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Assessment by the ordinary procedure of the "Regional Territorial Plan for the expansion of the Industrial Estate of Villadangos del Páramo" (León) |
Planz Planeamiento Urbanístico SLP |
2023 |
Environment |
Medium |
Europe |
Spain |
Request for authorization of Exceptional Use of Rustic Land and to the Duero Hydrographic Confederation for the construction of LAT 400 Kv |
Ric Sun España, SL |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental report for the non-substantial modification of the Boedo 2 project |
Ric Sun España, SL |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental report for the Non-Substantial Modification of the Boedo 1 project and its evacuation line to SET Promoters |
Ric Sun España, SL |
2023 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the preparation of justification documents for compliance with the DIA conditions for obtaining the Prior Administrative Authorization of 10 solar plants located in Castilla y León |
Ric Sun España, SL |
2023 |
Environment |
Small |
Europe |
Spain |
Elaboration of the PVA of the photovoltaic solar plants "Adaja I", "Sinfonía I" and "El Caballero" and their evacuation infrastructures, located in the TTMM of Medina del Campo, Ramiro, San Vicente del Palacio, Ataquines and La Zarza (Valladolid ). |
Ric Sun España, SL |
2023 |
Environment |
Small |
Europe |
Spain |
Preparation of Works Restoration Plans for the photovoltaic solar plants "Adaja I", "Sinfonía I" and "El Caballero" (Valladolid province) |
Ric Sun España, SL |
2023 |
Environment |
Medium |
Europe |
Spain |
Preparation of the Environmental Monitoring Program for the "Torozos I", "Torozos II" and "Torozos III" photovoltaic solar plants and their evacuation infrastructures, located in the TTMM of Simancas, Arroyo de la Encomienda, Ciguñuela (Valladolid). |
Ric Sun España, SL |
2023 |
Environment |
Small |
Europe |
Spain |
Elaboration of the PVA of the photovoltaic solar plants "Iron 1", "Centauro 1", "Line 1" and "Clave 1" and their evacuation infrastructures, located in the TTMM of Torrecilla de la Abadesa, Bercero and Villalar de los Comuneros ( Valladolid). |
Ric Sun España, SL |
2023 |
Environment |
Medium |
Europe |
Spain |
Initiation Document for the Las Cabañas wind farm project, in the province of Palencia |
ABO WIND ESPAÑA S.A.U. |
2023 |
Environment |
Medium |
Europe |
Spain |
Execution of the avifauna and bats study and the environmental scope initiation document for the La Parva Wind Farm and La Laguna Wind Farm projects located in the province of Burgos |
ABO WIND ESPAÑA S.A.U. |
2023 |
Environment |
Small |
Europe |
Spain |
Preliminary Fauna Studies and Initiation Document for the Paldejas Wind Farm and Calero Wind Farm projects, in the province of Burgos |
ABO WIND ESPAÑA S.A.U. |
2023 |
Environment |
Small |
Europe |
Spain |
Initial Project Document and avifauna study for the environmental impact assessment procedure of the Berg I Wind Farm (Burgos) |
ABO WIND ESPAÑA S.A.U. |
2023 |
Environment |
Medium |
Europe |
Spain |
Environmental dismantling and restoration project and environmental monitoring plan for the Cluster Cerrato projects, at the Cerrato node (Palencia). |
ABO WIND ESPAÑA S.A.U. |
2023 |
Environment |
Small |
Europe |
Spain |
TECHNICAL ASSISTANCE FOR THE AUTHORIZATION OF THE ALCONADA PHOTOVOLTAIC HYBRIDIZATION PROJECT IN THE MUNICIPALITY OF AMPUDIA |
AGREDA ASSET MANAGER S.L. (AGR-AM) |
2023 |
Environment |
Medium |
Europe |
Spain |
EDARi Aviagen |
AVIAGEN SAU |
2023 |
Water |
Small |
Europe |
Spain |
Commercial study for the implementation of Tertiary Treatment at WWTPs |
Capital Energy |
2023 |
Water |
Small |
Europe |
Ireland |
Independent Solar Resource Assessment & Supply of Ground Measurement Data for BIG 3 PIV Portfolio 259 MWp and Little Brothers PV Portfolio 22,107 MWp in Ireland |
Private Entity |
2022 |
Energy |
Small |
Europe |
Moldova |
Regulatory tariff support |
Private Entity |
2022 |
Management Consulting |
Small |
Europe |
Northern Macedonia |
Market Consultant for the HPP Cebren Project |
Private Entity |
2022 |
Management Consulting |
Small |
Europe |
Slovenia |
Consultant supervision services for compensation device 400 kV STATCOM of +- 150 Mvar for SINCRO.GRID project |
Private Entity |
2022 |
Energy |
Small |
Europe |
Spain |
Technical Due Diligence Solar Plant Project (PTC + PV) in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
Technical Advisory Services for burial of 400 kV OHL in Magallon node in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
Technical Support for a BESS facility for PITARCO PV Project in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
PV-TA: Technical Advisory Services for 2 PV Plants in Murcia (Spain) |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
Technical Support CSP Hybrid Plant Auction in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
Technical Support for Merge and Acquisition of PV Portfolio in Spain (10 PV Plants) |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
PV and HV engineering review services for Talayuela II PV plant in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
Lenders Technical Advisor for O&M annual supervision of 4 PV plants in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
Technical Advisory Services for Peñaflor Wind Farm Hybridization Project in Spain |
Private Entity |
2022 |
Energy |
Confidential |
Europe |
Spain |
TOPOGRAPHIC SURVEY AND LAYOUT OF SUPPORTS PV JUMILLA |
GRUPO ORTIZ |
2022 |
Energy |
Confidential |
Europe |
Spain |
Modification of the Environmental Impact Study of the PE "Palentino" of 40 MW in the surroundings of Paredes de Nava (Palencia) |
FOTOWATIO RENEWABLE VENTURES |
2022 |
Environment |
Confidential |
Europe |
Spain |
EXTENSION OF THE AVIFAUNA STUDY OF THE EVACUATION LAT OF THE "PALENTINO" EP AND MODIFICATION OF SECTIONS OF THE ENVIRONMENTAL IMPACT STUDY |
FOTOWATIO RENEWABLE VENTURES |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental processing of the photovoltaic solar plant Zamora Solar 3, in the municipality of Zamora (Zamora) |
FOTOWATIO RENEWABLE VENTURES |
2022 |
Environment |
Confidential |
Europe |
Spain |
FAUNA STUDY OF PE "RICOPOWER" IN THE TT.MM. FROM MUELAS DEL PAN AND ZAMORA, AND ITS EVACUATION LINE TO SET ZAMORA 220KV |
FOTOWATIO RENEWABLE VENTURES |
2022 |
Environment |
Confidential |
Europe |
Spain |
STUDY OF AVIFAUNA AND BATS IN THE SURROUNDINGS OF THE PPEE PALENTINE, MANQUILLO AND PAREDES DEL VIENTO, AND THEIR EVACUATION LAT, FOR THE EIA PROCEDURE OF THE PROJECTS |
FOTOWATIO RENEWABLE VENTURES |
2022 |
Environment |
Confidential |
Europe |
Spain |
25 KV MEDIUM VOLTAGE LINE FOR THE VALDURRIOS I AND II IRRIGATION COMMUNITY PUMPING STATION |
IMASA ENERGÍA - Ingeniería y Proyectos S.A. |
2022 |
Energy |
Confidential |
Europe |
Spain |
Acuerdo marco: Servicios de ingeniería y tramitación para plantas fotovoltaicas menores de 30 MW |
Iberdrola Renovables - IBR |
2022 |
Energy |
Confidential |
Europe |
Spain |
Initial Project Document for the environmental assessment of the 88.2 MWp "PSFV Valmadrigal" project, in the Santa Cristina de Valmadrigal tm (León) |
Voltalia |
2022 |
Environment |
Confidential |
Europe |
Spain |
Technical assistance in the processing of authorizations for the discharge of rainwater and wastewater from the Biomass Plant located in the Bayo Industrial Estate, in Cubillos del Sil (León) |
Forestalia Renovables S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
CONSTRUCTION PROJECT AND DETAILED ENGINEERING LINE 45 KV YEPES |
ELECNOR |
2022 |
Energy |
Confidential |
Europe |
Spain |
PROJECT FOR EVACUATION LINE OF SOLAR PHOTOVOLTAIC PLANT IN PUERTOLLANO |
ELECNOR |
2022 |
Energy |
Confidential |
Europe |
Spain |
HIGH VOLTAGE AERIAL LINE 132 KV CASTEJON SUBSTATION |
AYESA |
2022 |
Energy |
Confidential |
Europe |
Spain |
Study of cumulative and synergistic effects at the Mudarra 400 junction (Valladolid). Expansion of range with wind farms |
ABEI ENERGY |
2022 |
Environment |
Confidential |
Europe |
Spain |
MANZANARES I PROJECT 87,5 MWp |
Blue Viking Solar S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
TORRECILLA ALTA PROJECT 71.3 MWp |
Blue Viking Solar S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
REYNOSA WIND FARM DOWNBURST REPORT |
ACCIONA HEADQUARTER |
2022 |
Energy |
Confidential |
Europe |
Spain |
AERIAL / UNDERGROUND LINE 30 KV PARKS A SEC GAÑIDOIRA 30/66 |
IDOM |
2022 |
Energy |
Confidential |
Europe |
Spain |
SUPPORT FOR THE ENGINEERING WORKS OF THE PROPERTY IN THE EMPIRE STATE ALTERNATE PROJECT (ESL) |
IDOM |
2022 |
Energy |
Confidential |
Europe |
Spain |
SAN CRISTOBAL - EL PUNTAL II DOUBLE CIRCUIT 30 KV POWER LINE PROJECT |
IDOM |
2022 |
Energy |
Confidential |
Europe |
Spain |
DAMAGE MANAGEMENT. CAPACITY INCREASE 400 KV ALDEADAVILA - ARAÑUELO. |
Red Electrica de España (REE) |
2022 |
Energy |
Confidential |
Europe |
Spain |
PERMITS AND DAMAGE AGENT. LAT 220 ACECA-PICON. GROWTH OF 3 SUPPORTS |
Red Electrica de España (REE) |
2022 |
Energy |
Confidential |
Europe |
Spain |
LINEA MEZQUITA - PLATEA 400 kV |
Red Electrica de España (REE) |
2022 |
Energy |
Confidential |
Europe |
Spain |
Processing of the Environmental Assessment of a "Zamora" photovoltaic solar plant in the municipality of Zamora (Castilla y León). |
Solaria |
2022 |
Environment |
Confidential |
Europe |
Spain |
Processing of the Environmental Assessment of the 50 MWp Photovoltaic Plant "Pazan Solar" in the municipalities of Villamediana and Valdeolmillos, in the province of Palencia (Castilla y León). |
Solaria |
2022 |
Environment |
Confidential |
Europe |
Spain |
TECHNICAL STUDY FOR HIGH VOLTAGE AERIAL LINE CROSSING MANGRANERS - BEGUES |
Solaria |
2022 |
Energy |
Confidential |
Europe |
Spain |
GAROÑA TOPOGRAPHIC STUDY |
Solaria |
2022 |
Energy |
Confidential |
Europe |
Spain |
Environmental monitoring plan for the works of the Algiedi solar photovoltaic plant |
Solaria |
2022 |
Environment |
Confidential |
Europe |
Spain |
Acoustic modeling for the modifications of the Manciles I, Manciles II, Sasamón and Estepar Wind Farms in the province of Burgos |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Expansion Study of birds for the Environmental Impact Study of the LAT 220 kv from SET PE Sasamón to SET Cillamayor (Burgos-Palencia) |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study of the Hybridization of the Velilla PE with a 240 MWp PV plant (Palencia) |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study of the 100 MW Cabeza Gorda Wind Farm in Serradilla del Arroyo TM and its Evacuation Line to SET Ciudad Rodrigo (Salamanca) |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study and Complementary Studies of the 200 MW Wind Farm in the Velilla area, Palencia |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study of the 50 MW Cabeza Gorda II Wind Farm in Serradilla del Arroyo TM, Salamanca |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Drafting of the EsIA of the Cabeza Gorda Wind Farm 49.5 MW with 11 machines of 4.5 MW/ud located in Sierra de Carazo and Sierra de Valdefuentes (Salamanca) |
GAMESA |
2022 |
Environment |
Confidential |
Europe |
Spain |
HIGH VOLTAGE AERIAL LINE 220 KV ALCAMPO - ARIAS |
Texla Renovables |
2022 |
Energy |
Confidential |
Europe |
Spain |
Waste Disposal Memory (Separata de Residuos) for Falces, Miranda de Arga Berbinzana Olite Tafalla and Larraga |
Agrowind Navarra 2013 S.L.U. |
2022 |
Environment |
Confidential |
Europe |
Spain |
ELECTROMECHANICAL ASSEMBLY OF THE SUBSTATION AT THE ALBISPARK PLANT 35 Mw |
ELMYA S.A. |
2022 |
Energy |
Confidential |
Europe |
Spain |
CROSS BREAK SUPPORT REPORT 14 66 KV ACULA AERIAL LINE |
EUSKABEA ELECTROTECNICA DEL URUMEA S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
220 KV HIGH VOLTAGE INTERCONNECTION LINE MARAGATO SUBSTATION - VALDERREY SUBSTATION |
SISENER INGENIEROS S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
ELECTROMAGNETIC FIELDS 220 KV HIGH VOLTAGE OVERHEAD LINE "COLECTOR BCN NORTE" AIR CENTER "COLECTOR BCN SUR" AIR CENTER |
THE GREEN TIE S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
L' ESPLUGA 220 kV LINE CONCA SUBSTATION - PROMOTORES SUBSTATION |
THE GREEN TIE S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
STUDY OF AFFECTIONS OF PARRALES 220 KV HIGH VOLTAGE AERIAL LINE |
THE GREEN TIE S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
TOPOGRAPHY OF THE VALCASADO AND PATRIA I PHOTOVOLTAIC SOLAR PLANT |
THE GREEN TIE S.L. |
2022 |
Energy |
Confidential |
Europe |
Spain |
Technical assistance for the correction of the Environmental Document and complementary fauna studies for the Garray Aerodrome Expansion Project, in the Garray TM (Soria) |
Sociedad Pública de Medio Ambiente de Castilla y León (SOMACyL) |
2022 |
Environment |
Confidential |
Europe |
Spain |
Substantial modification of the Integrated Environmental Authorization of the ECOPARQUE de Burgos |
Sociedad Pública de Medio Ambiente de Castilla y León (SOMACyL) |
2022 |
Environment |
Confidential |
Europe |
Spain |
Drafting of landscape and visual incidence studies, as well as environmental assessment documents of the Segovia Hospital Regional Plan and DOTSeg modifications |
Sociedad Pública de Medio Ambiente de Castilla y León (SOMACyL) |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental processing of a 17 MW solar plant located in Villamañan (León) |
Solaer España Energías Renovables, S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Processing of the environmental impact assessment of a photovoltaic solar plant project located in the municipality of La Bañeza (León) |
Solaer España Energías Renovables, S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Acoustic modeling of synergies at the Sasamón Wind Farm in the province of Burgos |
SSE Renewables |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental processing of the SET El Anisal for the evacuation of the Armus and Pazán solar plants, and expansion of archaeological works of the Armus and Pazán solar plants (Palencia) |
Subestación El Anisal S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Technical assistance for a request to change the administrative regime from unified environmental authorization to an environmental license for a manufacturing facility for metal structures for construction located in the Iscar tm, Valladolid |
TALLERES HERMANOS CATALINA, S.A. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Strategic Environmental Assessment by the simplified procedure of the "Regional Plan of Territorial Scope for the expansion of the Technological Park of León" |
TRIGONO CONSULTORES S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Consulting service and specialized technical assistance of an environmental nature on demand, including participation in Due Diligence processes |
Valority Medio Ambiente S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study of the project for the exploitation of Tin and Wolfgram resources "Valtreixal nº 1906 and "Alto de los Repilados" nº 1352 in the municipal area of Pedralba de la Pradería, Requejo and Puebla de Sanabria (Zamora) |
VALTREIXAL RESOURCES SPAIN, S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Specialized technical assistance and on-demand environmental consultancy for the activities of a hazardous and non-hazardous waste manager with facilities in the municipalities of Valladolid and La Cistérniga, province of Valladolid |
VEGANZONES E HIJOS, S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Simplified Environmental Impact Assessment of the expansion of the wastewater treatment plant of an agri-food industry in Medina del Campo, Valladolid. |
Vértice Ingeniería Integral S.L.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Technical assistance for the processing of the Integrated Environmental Authorization of a pharmaceutical ingredients production plant through chemical or biological processes in the PT of Boecillo (Valladolid) |
Vértice Ingeniería Integral S.L.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
Supporting document in response to the requirement on compliance with art 13 DL 2/2022 of PSFV Santico I, II and III |
Viridi Energías Renovables España, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Study of cumulative and synergistic effects in the Santiz knot (Salamanca and Zamora) |
Viridi Energías Renovables España, S.L. |
2022 |
Environment |
Confidential |
Europe |
Spain |
REPORT ON THE AVAILABILITY OF POTENTIALLY USEFUL WASTE FOR CDR/CSR PRODUCTION IN THE SURROUNDINGS OF THE TORAL DE LOS VADOS PLANT (LEÓN, SPAIN) |
VOTORANTIM CEMENTOS ESPAÑA SA |
2022 |
Environment |
Confidential |
Europe |
Spain |
Avifauna and bats study for the Environmental Impact Study of the PE "La Muriela" in TTMM of Palazuelo de Vedija, Aguilar de Campos, Moral de la Reina and Berrueces (Valladolid) |
WPD DEVELOPMENT RENOVABLES SL |
2022 |
Environment |
Medium |
Europe |
Spain |
Study of fauna in the surroundings of the PE El Zumaquero park and the PV El Tostadero plant of 50 MW each. Valladolid |
WPD DEVELOPMENT RENOVABLES SL |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "Corralnuevo" wind farm (Extension 1) |
WPD Parque Eólico Corralnuevo, S.L.U. |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "El Poleo" wind farm (Extension 1) |
WPD PARQUE EÓLICO EL POLEO S.L.U. |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental Monitoring Plan in the exploitation phase of the "Panaderas" wind farm (Extension 1) |
WPD PARQUE EÓLICO LAS PANADERAS S.L.U. |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental Monitoring Plan in the exploitation phase of the "Navillas" wind farm (Extension 1) |
WPD Parque Eólico Navillas S.L.U. |
2022 |
Environment |
Small |
Europe |
Spain |
Study of cumulative and synergistic effects of the Barreiros IV wind farm and evacuation overhead line in various TTMMs in the provinces of Lugo and Asturias |
WPD-TECNORENOVA, S.L.U. |
2022 |
Environment |
Medium |
Europe |
Spain |
Study of cumulative and synergistic effects of the Barreiros I, Barreiros II and Barreiros III wind farms, in various TTMMs in the provinces of Lugo and Asturias |
WPD-TECNORENOVA, S.L.U. |
2022 |
Environment |
Small |
Europe |
Spain |
Technical Assistance for the expansion of an authorized end-of-life vehicle decontamination center in Onzonilla, León |
Abril 2001 Desguaces, S.A. |
2022 |
Environment |
Small |
Europe |
Spain |
REPORTS AND PRELIMINARY PROJECTS FOR CONNECTION REQUEST |
ALTER ENERSUN S.A. |
2022 |
Energy |
Large - Multiannual |
Europe |
Spain |
LA LUZ I PHOTOVOLTAIC SOLAR PLANT, LA LUZ SUBSTATION AND HIGH VOLTAGE LINE SINGLE CIRCUIT 220 LA LUZ - COLON |
ALTER ENERSUN S.A. |
2022 |
Energy |
Medium |
Europe |
Spain |
TECHNICAL ASSISTANCE FOR THE SUPPLY OF THE ELECTRICAL INSTALLATION FOR URBANIZATION OF THE LA NAVA INDUSTRIAL ESTATE |
AYUNTAMIENTO DE PUERTOLLANO |
2022 |
Energy |
Small |
Europe |
Spain |
AERIAL LINE 15 KV RIBERA - HUELVA |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2022 |
Energy |
Small |
Europe |
Spain |
EVACUATION LINE PHOTOVOLTAIC FARM AERIAL LINE 15 KV ZAVIAL - NIEBLA |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2022 |
Energy |
Small |
Europe |
Spain |
AERIAL LINE 15 KV ALCORES - ALCALA |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2022 |
Energy |
Small |
Europe |
Spain |
PLS TOWER TRAINING COURSE |
FABRICACIONES METALICAS MORENO S.A. |
2022 |
Energy |
Small |
Europe |
Spain |
MEDIUM AND LOW VOLTAGE LINES FOR THE CUSTOMER ENDESA |
GABITEL SOLUCIONES TÉCNICAS S.L. |
2022 |
Energy |
Small |
Europe |
Spain |
BASIC ENGINEERING AND DETAILED ENGINEERING OF A SINGLE CIRCUIT 220 KV HIGH VOLTAGE AERIAL LINE ERSUR SUBSTATION - MARCONA SUBSTATION |
ISASTUR INGENIERÍA S.A. |
2022 |
Energy |
Medium |
Europe |
Spain |
PROJECT ENGINEERING FOR HIGH VOLTAGE AERIAL LINES TENDERS |
ISASTUR INGENIERÍA S.A. |
2022 |
Energy |
Small |
Europe |
Spain |
RESISTIVITY MEASUREMENT IN ODENA - IGUALADA |
MATACAN SOLAR S.L. |
2022 |
Energy |
Small |
Europe |
Spain |
HIGH VOLTAGE LINE 220 KV ALGECIRAS - NUEVA CASARES |
SISTEM MELESUR ENERGÍA S.A. |
2022 |
Energy |
Small |
Europe |
Spain |
TRANSMISSION TO THE UNDERGROUND OF A SECTION OF A 15 KV AERIAL PRIVATE LINE 1.7 KM LENGTH IN MANZANARES |
VITA GESTION DE PROYECTOS S.L. |
2022 |
Energy |
Small |
Europe |
Spain |
Preparation of an Addendum to the Environmental Impact Study of the photovoltaic solar plant "PSFV Mudarra" located in the municipalities of Valladolid and La Mudarra (Valladolid province). |
E.E.W. Eco Energy World Development Holdings One B.V, S.S. Kumlin |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental technical assistance to a WEEE manager in Valladolid |
EASY MOVIL RECYCLING, S.L. (RECYTRONICA) |
2022 |
Environment |
Medium |
Europe |
Spain |
Technical assistance for the legalization of a waste management activity for electrical and electronic equipment in Valladolid |
EASY MOVIL RECYCLING, S.L. (RECYTRONICA) |
2022 |
Environment |
Medium |
Europe |
Spain |
Processing of the Environmental Assessment of the photovoltaic solar plant "PSFV Proyecto 2" located in the municipalities of La Mudarra and Medina de Rioseco, province of Valladolid (Castilla y León) |
Eco Energy World Ltd. (EEW) |
2022 |
Environment |
Medium |
Europe |
Spain |
Processing of the Environmental Assessment of the photovoltaic solar plant "PSFV Project 1" located in the municipalities of La Mudarra and Medina de Rioseco, province of Valladolid (Castilla y León). |
Eco Energy World Ltd. (EEW) |
2022 |
Environment |
Medium |
Europe |
Spain |
Technical Assistance for the adaptation to the best available techniques of a manager of hazardous and non-hazardous waste in Pamplona (Navarra) |
ECOIRUÑA TRATAMIENTO DE RESIDUOS, S.L.U. |
2022 |
Environment |
Medium |
Europe |
Spain |
Analysis and appraisal of the Environmental Impact Study and authorization procedure for the Salave Gold Mining project (Tapia de Casariego, Asturias) |
Ecourban Consultores, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Report on the condition of the Asset of Cultural Interest "Camino de Santiago" of the 45 kV "La Frontera" overhead line project, in the municipalities of Vega de Valcarce, Trabadelo and Villafranca del Bierzo (León) |
Elawan Energy, S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Audit and environmental monitoring of the legal proceedings Campanario Eólica |
Elawan Energy, S.L. |
2022 |
Environment |
Large - Multiannual |
Europe |
Spain |
Permanent environmental technical assistance to a company in the energy sector of the Autonomous Community of Castilla y León |
Eólica de La Ruya, S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Technical assistance for the processing of the authorization of non-hazardous waste manager of the Wastewater Treatment Station of León and its surroundings (León) |
Estudio de Ingeniería Civil, S.L. (EIC) |
2022 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the review of the AAI, regarding its adaptation to the Best Available Techniques of a Municipal Waste Treatment Center, located in the municipality of Aranda de Duero (Burgos). |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2022 |
Environment |
Large - Multiannual |
Europe |
Spain |
Technical assistance in the revision of the AAI for the adaptation to the Best Available Techniques (MTDs) of the Waste Treatment Center "Los Huertos" (province of Segovia) |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2022 |
Environment |
Medium |
Europe |
Spain |
Specialized assistance in the processing of a hazardous and non-hazardous industrial waste transfer facility in the PI La Mora-Garay (Gijón) |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2022 |
Environment |
Small |
Europe |
Spain |
Technical assistance for environmental legalization of an asphalt agglomerate production plant in Benazolve, municipality of Ardón (León) |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2022 |
Environment |
Medium |
Europe |
Spain |
Assistance for the justification of the adaptation to the best available techniques of a second fusion lead recovery plant in S. Esteban de Gormaz (Soria) |
EXIDE TECHNOLOGIES, S.L.U |
2022 |
Environment |
Medium |
Europe |
Spain |
Technical assistance in the adaptation to the best available techniques (BAT) of the Burgos Ecopark |
Ferrovial Servicios, S.A. (Ferroser) |
2022 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the processing of the Integrated Environmental Authorization of a plant for the recovery of hazardous and non-hazardous waste in Plasencia (Cáceres) |
Ferrovial Servicios, S.A. (Ferroser) |
2022 |
Environment |
Confidential |
Europe |
Spain |
Assistance for the processing of the Unified Environmental Authorization of a hazardous and non-hazardous waste storage plant in Alfacar (Granada) |
Ferrovial Servicios, S.A. (Ferroser) |
2022 |
Environment |
Large |
Europe |
Spain |
Environmental impact assessment of the "FV Fotosfera Boecillo" photovoltaic plant, investment and transformation center and evacuation line for network access in the municipality of Boecillo (Valladolid province). |
FOTOSFERA RENOVABLES SL. |
2022 |
Environment |
Large |
Europe |
Spain |
Strategic Environmental Document of the Partial Plan sector SUP-30 "La Aldehuela" in the tm of Zamora (Zamora) |
FRANCISCO SOMOZA RODRÍGUEZ-ESCUDERO |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental monitoring plan for the Valdecarretas photovoltaic plant and its evacuation infrastructure in the municipality of Toro (Zamora). |
GENERACIÓN FOTOVOLTAICA EL LLANO S.L.U. |
2022 |
Environment |
Large |
Europe |
Spain |
Processing of the Environmental Assessment of two photovoltaic solar plants at the Nudo Herrera 400 in the province of Palencia (Castilla y León) |
Green RIC Energy, S.L |
2022 |
Environment |
Small |
Europe |
Spain |
Activity initiation procedure and authorization to increase the capacity of an organic waste management plant in Villacastín (Segovia) |
GRUPO VALORA GESTIÓN DE RESIDUOS S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Previous birdlife studies in the areas occupied by 5 "Sistemas Eólicos Muñó" wind farms in the province of Burgos |
Grupo Villar |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental legislative update of IKEA Ibérica centers 2020-2022 |
IKEA Ibérica S.A. |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental technical assistance for the processing of the communication of initiation of a WEEE management plant in La Bañeza, León |
ILUNION RECICLADOS, S.A |
2022 |
Environment |
Large |
Europe |
Spain |
Technical assistance for the calculation and registration of the Corporate Carbon Footprint of two WEEE recycling plants in León and Madrid |
ILUNION RECICLADOS, S.A |
2022 |
Environment |
Medium |
Europe |
Spain |
Assistance for the processing of the Declaration responsible for communication of the start of a WEEE recycling industry in the province of Palencia |
Industria del Reciclaje de RAEEs S.L. (INDURAEES) |
2022 |
Environment |
Medium |
Europe |
Spain |
INTEGRATED ENVIRONMENTAL AUTHORIZATION OF A METAL COMPONENT PRODUCTION PLANT FOR THE AERONAUTICAL INDUSTRY IN VILLAMURIEL DEL CERRATO (PALENCIA) |
INMAPA AERONAUTICA, S.L.U. |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental technical and administrative assistance in the implementation of an R&D plant and production of active pharmaceutical ingredients (León) |
4D Pharma León S.L.U |
2022 |
Environment |
Confidential |
Europe |
Spain |
Avifauna and bat studies for "Pico de la Iglesia" wind farms in Garoña (Burgos) |
ALFANAR ENERGÍA ESPAÑA S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
ENVIRONMENTAL IMPACT ASSESSMENT AND INTEGRATED ENVIRONMENTAL AUTHORIZATION OF A 49.9MWE ELECTRIC POWER GENERATION PLANT IN THE MUNICIPALITY OF LA ROBLA (LEÓN) |
REOLUM RENOVABLES SL |
2022 |
Environment |
Medium |
Europe |
Spain |
Expert report on two disciplinary proceedings and a criminal trial on the WWTP of Astorga |
AQUONA GESTION DE AGUAS DE CASTILLA SAU |
2022 |
Water |
Medium |
Europe |
Spain |
Initiation Document for the Ordinary Environmental Impact Assessment of the "Beldebú" Wind Farm (Palencia province) |
ARBA ENERGÍAS RENOVABLES, S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental impact assessment of the PSFV project "Atalaya" of 5 MW and evacuation infrastructures in the TM of Badajoz |
ARBA ENERGÍAS RENOVABLES, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental impact assessment and additional studies of the 50 MW "Olmedo" PSFV project and infrastructures (Valladolid) |
Asturmadi Promoción Solar, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
REQUEST FOR A SCOPE DOCUMENT FOR A 48.8 MWe BIOMASS POWER GENERATION PLANT IN THE MUNICIPALITY OF ANDORRA-TERUEL |
ATHMOS SOSTENIBILIDAD S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Assistance in the processing of the Environmental License of the photovoltaic plants of Valdorros and Villlaquirán in the province of Burgos |
BAS Corporation (Grupo Dominion) |
2022 |
Environment |
Medium |
Europe |
Spain |
Technical assistance for the design and implementation of an Environmental Management System according to ISO 14001 in a biotechnology industry in Boecillo (Valladolid) |
BDI - BIOTECHNOLOGY DEVELOPMENT FOR INDUSTRY IN PHARMACEUTICALS, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Consolidation of the EsIA of the Beneixama HIVE 50 Mw Photovoltaic Solar Plant for burying the evacuation LAT in the TT.MM. from Biar, Beneixama and Banyeres de Mariola (ALICANTE). |
Beneixama Hive S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental impact study of the Beneixama HIVE solar plant in the municipality of Biar (Alicante) |
Beneixama Hive S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Initial project document for the environmental evaluation of the PE "Pisuerga" of 130 MW and its evacuation to SET Herrera |
BOREAS TECNOLOGÍA, S.L |
2022 |
Environment |
Small |
Europe |
Spain |
Correction of the Initial Project Documents of PE "Ureño" and PE "Garita" |
BOREAS TECNOLOGÍA, S.L |
2022 |
Environment |
Small |
Europe |
Spain |
Assistance for the adaptation to the prescriptions of the Best Available Techniques of a feed manufacturing industry in Fuensaldaña, Valladolid |
CD FOODS SPAIN, S.A. |
2022 |
Environment |
Small |
Europe |
Spain |
Non-substantial modification of the integrated environmental authorization of the CERANOR facilities in Valencia de Don Juan (León), for the installation of biomass processing as replacement fuel. |
CERANOR S.A. |
2022 |
Environment |
Medium |
Europe |
Spain |
Technical Assistance for the adaptation to the Best Available Techniques of a manager of hazardous and non-hazardous waste in Orkoien (Navarra) |
CHATARRAS IRUÑA, S.A. |
2022 |
Environment |
Small |
Europe |
Spain |
Specialized technical assistance and environmental consultancy on demand for the activities of a vehicle manager at the end of its useful life in the municipality of Ávila |
Desguaces Ávila, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the processing of the expansion of the facilities of an authorized center for the treatment of vehicles at the end of their useful life in the municipality of Ávila |
Desguaces Ávila, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document of the Partial Plan in the tm of Almazán (Soria) |
Jesús Fernández Beltrán |
2022 |
Environment |
Small |
Europe |
Spain |
Assistance for the justification of adaptation to MTDs of a feed manufacturing plant in Valladolid |
MARCOPOLO COMERCIO, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Design and implementation of an Environmental Management System in an electrical cable manufacturing industry in the province of León |
Miguélez, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Preparation of an Addendum to the Environmental Document for the processing of the PV Villayerno photovoltaic solar plant, located in the municipality of Valle de las Navas (Burgos). |
Movimiento Azimutal, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Processing of the environmental evaluation of a 25 MWP Photovoltaic Solar Plant located in the municipality of Valle de las Navas, province of Burgos |
Movimiento Azimutal, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Study of birds and bats in the surroundings of the Villabrágima Wind Farm in the province of Valladolid. |
Naturgy Energy Group, S.A |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental report for the Non-Substantial Modification of the Valverde wind farm project in the municipalities of Valverde de Campos, Castromonte, Villabrágima and La Mudarra (Valladolid) |
NATURGY RENOVABLES, S.L.U |
2022 |
Environment |
Medium |
Europe |
Spain |
Establishment of emission factors for biowaste treatment processes |
Odournet S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Compensatory Measures Plan for PSFV LA Guardia and Valdenogal in the TM of Toro (Zamora) |
Otras Producciones de Energía Fotovoltaica, S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental Surveillance of the Magaz Wind Farm and its evacuation line in Palencia. Exploitation Phase. Extension 2021-22 |
Parque Eólico Magaz SLU |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental Surveillance Plan for the "FV Hontoria 10" photovoltaic plant in Hontoria de Cerrato and Soto de Cerrato (Palencia) |
Pío Cámara, S.A. |
2022 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document of the punctual modification of the NUM of the SU-1 sector of Orbita (Ávila) |
Planz Planeamiento Urbanístico SLP |
2022 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document Partial Plan of Sector 1 "Las Mangadas" of industrial developable land, of 47 ha in the Abades tm (Segovia) |
Planz Planeamiento Urbanístico SLP |
2022 |
Environment |
Large |
Europe |
Spain |
Strategic Environmental Document of the NUM of Herrera de Pisuerga (Valladolid) |
Planz Planeamiento Urbanístico SLP |
2022 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document of the Regional Project of the "Vicolozano II" sector of developable land, in the town of Vicolozano (Ávila) |
Planz Planeamiento Urbanístico SLP |
2022 |
Environment |
Medium |
Europe |
Spain |
TECHNICAL ASSISTANCE IN THE DRAFTING OF THE ANNUAL REPORT OF THE ENVIRONMENTAL MONITORING PROGRAM OF THE LEBRIJA I, II AND III SOLAR THERMAL POWER PLANTS, AS WELL AS THE EVACUATION POWER LINE |
Plenium Partners, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Study to assess compliance with legal requirements derived from environmental permits and authorizations granted to the Soluz-Guzmán Thermal Solar Plant, located in the municipality of Palma del Río (Córdoba) |
Plenium Partners, S.L. |
2022 |
Environment |
Large - Multiannual |
Europe |
Spain |
Support for the mid-term review of compliance with the objectives of the Strategic Waste Plan of the Principality of Asturias 2017-2024 |
Principado de Asturias - Consejería de Administración Autonómica, Medio Ambiente y Cambio Climático |
2022 |
Environment |
Medium |
Europe |
Spain |
Environmental technical and administrative assistance for a waste manager in Valladolid - 2018-2021 |
RECSO Reciclados Sostenibles, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental technical assistance to a manager of hazardous and non-hazardous waste in León |
RECUPERACIONES RECIPACAR, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Assistance for the legalization of a non-hazardous metal waste management activity in Onzonilla (León) |
RECUPERACIONES RECIPACAR, S.L. |
2022 |
Environment |
Small |
Europe |
Spain |
Report on the condition of the Asset of Cultural Interest "Canal de Castilla" of the "Boedo 1" Photovoltaic Plant project in the TT.MM of Herrera de Pisuerga and Alar del Rey (Palencia), |
Ric Sun España, SL |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental Processing of the "Adaja I" Photovoltaic Solar Plant and its underground evacuation line in the municipalities of Medina del Campo and Ramiro (Valladolid) |
Ric Sun España, SL |
2022 |
Environment |
Small |
Europe |
Spain |
Environmental technical assistance in the processing of the Ordinary EIA before the MITERD of two solar plants in the Nudo Olmedo 400 (Valladolid) |
Ric Sun España, SL |
2022 |
Environment |
Small |
Europe |
Spain |
Documents required after the DIA in the Sabinar Expansion PV Solar Plant (Cuenca) |
SABINAR HIVE, S.L. |
2022 |
Environment |
Medium |
Europe |
Spain |
Complete Annual Cycle Fauna Study, with the minimum scope necessary for the implementation of the project at the location of the ISF La Herrera Plant (Palencia) |
ABO WIND ESPAÑA S.A.U. |
2022 |
Environment |
Small |
Europe |
Spain |
Initial project document of the PFV "La Muñeca", hybridized to a wind farm, in the municipality of Ampudia |
AGREDA ASSET MANAGER S.L. (AGR-AM) |
2022 |
Environment |
Small |
Europe |
Spain |
Acuerdo marco: Servicios de ingeniería y tramitación para plantas fotovoltaicas en ciclos combinados |
|
2022 |
Energy |
Small |
Europe |
Ukraine |
Project Implementation Consultant for the Rehabilitation of 220kv, 330kv and 750 kV electrical substation, in frame of the PTP2. |
NPC UKRENERGO - PRIVATE JOINT STOCK COMPANY |
2022 |
Energy |
Medium |
Europe |
Albania |
ALBANIA Power Recovery Project - Consulting Services for Technical Assistance, Procurement Activities, Monitoring and Supervision of the Power Recovery Project |
Ministry of Infrastructure and Energy (MoIE) |
2021 |
Energy |
Small |
Europe |
Bosnia and Herzegovina |
PV-TA: Consultancy Services for Tender Procedure for EPC of Bileca 60 MW Solar PV Plant in Bosnia and Herzegovina |
Private Entity |
2021 |
Energy |
Small |
Europe |
Multi-country |
Framework Agreement for Renewable Energy Assessment |
Private Entity |
2021 |
Energy |
Small |
Europe |
Serbia |
Consulting services for construction of 400kv Single Circuit Transmission Line Kragujevac 2, Kraljevo 3, and extension of Substations Kragujevac 2 and Kraljevo |
Private Entity |
2021 |
Energy |
Small |
Europe |
Slovenia |
Project Implementation Consulting (PIC) Services for SINCROGRID project |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Self-consumption Spain: analysis of the regulatory framework |
Private Entity |
2021 |
Management Consulting |
Small |
Europe |
Spain |
CSP-TA: Technical Due Diligence and Site Visit for Puerto Errado II CSP Plant in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
PV-ES: Engineering Services for 2PV plants in Almeria (Indalo Projects) |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Technical Advisory Services for 720 MW Wind Projects in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Technical Due Diligence for M&A of 2 x 50 MWp PV Plants: Las Fuesas y La Custodia in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
TA-CSP: O&M Contract support CSP |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
PV-EPA: Energy Yield Assessment for multiple PV projects in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Design Engineering and Owner’s Engineering Services for CARRIL 400MW PV Plant, including SET, OHL and BESS in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
WIND-ES: Birds and Bats Preliminary Desktop Assessment for 2 Wind Farms (Gerona, Lerida) and OHL in Spain |
Private Entity |
2021 |
Environment |
Small |
Europe |
Spain |
CSP-TA: Hydrogen build up event in CSP Plant in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
CSP-TA: Temperature Loop for 4 CSP Plants in Spain (Extresol 1-2-3 & Manchasol 2) |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Owner's Engineer for Cabrera 200 MW PV Plant in Spain (in operation since 2021) |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Owner's Engineer for Talayuela 300 MW Solar PV Plant in Spain (in operation since 2021) |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Technical Due Diligence Solar Plant Project (CSP + PV) in Spain |
Private Entity |
2021 |
Energy |
Small |
Europe |
Spain |
Workshop on the electricity markets in Spain |
Private Entity |
2021 |
Management Consulting |
Small |
Europe |
Spain |
Environmental pre-feasibility study for the development of the PE "Carabeos" and evacuation LAAT to SET Aguayo (Cantabria) |
FOTOWATIO RENEWABLE VENTURES |
2021 |
Environment |
Small |
Europe |
Spain |
ENVIRONMENTAL PROCESSING OF THE 40 MW "SOTILLOS" PE AND EVACUATION INFRASTRUCTURES IN THE PROVINCE OF LEÓN |
FOTOWATIO RENEWABLE VENTURES |
2021 |
Environment |
Small |
Europe |
Spain |
Environmental feasibility study of a wind farm in Herrera de Pisuerga (Palencia) |
Engie Group |
2021 |
Environment |
Small |
Europe |
Spain |
Feasibility study of a wind farm in the municipality of Cubillos del Rojo (Burgos) |
Engie Group |
2021 |
Environment |
Small |
Europe |
Spain |
Basic feasibility analysis and Initiation Documents for the ordinary environmental impact assessment of 3 photovoltaic plants in Aragon |
Engie Group |
2021 |
Environment |
Small |
Europe |
Spain |
Basic feasibility analysis and Initiation Documents for the ordinary environmental impact assessment of 5 photovoltaic plants in Aragon |
Engie Group |
2021 |
Environment |
Small |
Europe |
Spain |
Feasibility study of two wind farms in the province of Palencia |
Engie Group |
2021 |
Environment |
Small |
Europe |
Spain |
Expert report at the request of a party in the contentious-administrative proceeding to challenge the Environmental Authorization |
Forestalia Renovables S.L. |
2021 |
Environment |
Small |
Europe |
Spain |
Environmental Supervision of the Biomass Plant Works and associated infrastructures in Cubillos del Sil (León) 2020 |
Forestalia Renovables S.L. |
2021 |
Environment |
Small |
Europe |
Spain |
Environmental Management of the construction of the Biomass Plant and associated infrastructures in Cubillos del Sil (León) |
Forestalia Renovables S.L. |
2021 |
Environment |
Small |
Europe |
Spain |
Response to the requirement for rectification in the matter of AAI, related to the composting plant of Villanueva de la Cañada (Madrid) |
Veolia France |
2021 |
Environment |
Small |
Europe |
Spain |
Engineering Services for the optimization of 2 PV plants in Almeria (Indalo Projects) |
ALFANAR ENERGY |
2021 |
Energy |
Small |
Europe |
Spain |
Energy Yield Assessment for multiple PV projects in Spain (785 MWp) |
Quercus Real Assets |
2021 |
Energy |
Small |
Europe |
Spain |
TOPOGRAPHY SERVICES SAN MARTIÑO - LAROUCO 132 KV HIGH VOLTAGE LINE |
AYESA |
2021 |
Energy |
Small |
Europe |
Spain |
TOPOGRAPHY SERVICES HIGH VOLTAGE LINE FIAL DAS CORZAS - TRIVES 220 KV |
AYESA |
2021 |
Energy |
Small |
Europe |
Spain |
220 KV LINE TOPOGRAPHY WORKS. TEMPLARIOS - MURUARTE |
IDOM |
2021 |
Energy |
Small |
Europe |
Spain |
400 kV LINE EBRO CORRIDOR (MIRANDA 220, SANTA ENGRACIA 220, JUNDIZ 220) LIDAR |
IDOM |
2021 |
Energy |
Small |
Europe |
Spain |
Tender: 2019-3297 - MULTIPURPOSE AERIAL INSPECTION (IAP) 2020 |
Red Electrica de España (REE) |
2021 |
Energy |
Small |
Europe |
Spain |
Drafting of the Decommissioning Plan for the Tordesillas I, Tordesillas II, Tordesillas III and Medina PV plants |
Solaria |
2021 |
Environment |
Small |
Europe |
Spain |
Study of cumulative and synergistic effects at the Mudarra 400 junction (Valladolid) |
Solaria |
2021 |
Environment |
Small |
Europe |
Spain |
Reports for authorization of exceptional use of rustic land for the photovoltaic plants Valentina Solar (Asturianos, Rosinos de Requejada and Palacios de Sanabria, province of Zamora) and Aries Solar (Medina del Campo, province of Valladolid) |
Solaria |
2021 |
Environment |
Small |
Europe |
Spain |
Processing of the Environmental Assessment of the 50 MWp Photovoltaic Plant "Armus Solar" in the municipalities of Villamediana and Magaz de Pisuerga, in the province of Palencia (Castilla y León). |
Solaria |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental evaluation of the 80 MWp Pegasus solar photovoltaic plant in the municipality of Valladolid (Valladolid) |
Solaria |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental impact study of the Capricornius Solar and Algedi Solar solar plants |
Solaria |
2021 |
Environment |
Confidential |
Europe |
Spain |
PRELIMINARY PROJECTS FOR EVALUATION FACILITIES NUDO MURUARTE |
Solaria |
2021 |
Energy |
Confidential |
Europe |
Spain |
Environmental Surveillance Plan in the construction phase of the Auriga Solar plant in the TT.MM. of Renedo de Esgueva and Valladolid |
Solaria |
2021 |
Environment |
Confidential |
Europe |
Spain |
Execution of the Environmental Surveillance Plan for the works of the "Capricornius solar" photovoltaic plant in the TMs of Magaz de Pisuerga and Palencia |
Solaria |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance Plan on site and compensatory measures project for 3 photovoltaic plants in the province of Salamanca |
Solaria |
2021 |
Environment |
Confidential |
Europe |
Spain |
Feasibility Study for the Vallejera Wind Farm (Burgos and Palencia) |
VESTAS Spain |
2021 |
Environment |
Confidential |
Europe |
Spain |
Avifauna study for the Environmental Impact Study of the LAT 132 kv from SET PPEE Cabeza Gorda to SET Ciudad Rodrigo (Salamanca) |
GAMESA |
2021 |
Environment |
Confidential |
Europe |
Spain |
Modification of the Environmental Impact Study and Complementary Studies of the 200 MW Wind Farm in the Velilla area, Palencia |
GAMESA |
2021 |
Environment |
Confidential |
Europe |
Spain |
Avifauna study for the Environmental Impact Study of the LAT 220 kv from SET PE Sasamón to SET Cillamayor (Burgos-Palencia) |
GAMESA |
2021 |
Environment |
Confidential |
Europe |
Spain |
HIGH VOLTAGE LINE 30 KV DOUBLE INTERCONNECTION CIRCUIT OF SOLAR PHOTOVOLTAIC PARK WITH SUBSTATION AND HIGH VOLTAGE LINE 132 KV |
Texla Renovables |
2021 |
Energy |
Confidential |
Europe |
Spain |
400 KV HIGH VOLTAGE LINE IN ARCHIDONA WITH RMF IN SUPPORT |
Texla Renovables |
2021 |
Energy |
Confidential |
Europe |
Spain |
HIGH VOLTAGE AERIAL LINE 220 KV PISUERGA AND RUBAGON |
BBA1 International Engineering |
2021 |
Energy |
Confidential |
Europe |
Spain |
HIGH VOLTAGE LINE 220 KV COSTA DA MORTE |
BBA1 International Engineering |
2021 |
Energy |
Confidential |
Europe |
Spain |
CONCRETE SUPPORT STUDIES IN MEXICO |
ISOTRON S.A.U. |
2021 |
Energy |
Confidential |
Europe |
Spain |
ACCESS ROAD PROJECT TO SUPPORT Nº 51 OF THE 400 KV ELIANA - GAUSA LINE |
MONCISA MONTAJES Y OBRA CIVIL S.A. |
2021 |
Energy |
Confidential |
Europe |
Spain |
66 KV UNDERGROUND LINE PROJECT FOR WIND FARM EVACUATION IN THE CANARY ISLANDS |
SISENER INGENIEROS S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
SUPPORT PAS OUTPUT OF SUBSTATION OF 132 KV OR LOWER |
SOCIEDAD ESPAÑOLA DE MONTAJES INDUSTRIALES S.A. |
2021 |
Energy |
Confidential |
Europe |
Spain |
Processing of the environmental evaluation of a 30 MW photovoltaic solar plant located in the municipality of Toro (province of Zamora). |
SYNERGIA ENERGY SOLUTIONS SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Archaeological control during the construction phase of the El Poleo, Las Panaderas, Navillas and Corralnuevo wind farms. La Mudarra Norte and Navabuena Norte in several municipalities of the province of Valladolid |
WPD CONSTRUCTION SPAIN, S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance in the construction phase of the PPEE, El Poleo, Las Panaderas, Corralnuevo, Navilllas, La Mudarra Norte and Navabuena Norte (Nudo Mudarra - Valladolid) |
WPD CONSTRUCTION SPAIN, S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental reports for the extension of the DIA of the Navabuena Sur, La Mudarra Norte, Navabuena Norte, La Matilla and La Mudarra Sur wind farms (Valladolid province) |
WPD DEVELOPMENT RENOVABLES SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Drafting of the Initial Project Document for the Ordinary Environmental Impact Assessment of the wind farm "La Muriela" in TT.MM. from Palazuelo de Vedija, Aguilar de Campos, Moral de la Reina and Berrueces (Valladolid) |
WPD La Muriela, S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "Corralnuevo" wind farm |
WPD Parque Eólico Corralnuevo, S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Drafting of the Corralnuevo Wind Farm Decommissioning Plan |
WPD Parque Eólico Corralnuevo, S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "El Poleo" wind farm |
WPD PARQUE EÓLICO EL POLEO S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "Las Panaderas" wind farm |
WPD PARQUE EÓLICO LAS PANADERAS S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance Plan in the exploitation phase of the "Navillas" wind farm |
WPD Parque Eólico Navillas S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
SIMPLIFIED ENVIRONMENTAL ASSESSMENT OF A 10 MW PHOTOVOLTAIC SOLAR PLANT AND ITS LAT IN THE MUNICIPALITIES OF CIGUÑUELA AND ZARATÁN (VALLADOLID) |
ZURVAN GESTION DE PROYECTOS SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
220 KV TRIPLE CIRCUIT EVACUATION LINE BEANDRESA - BECHI |
EDIP SERVICIOS INDUSTRIALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
SECTIONING PROJECT FOR HIGH VOLTAGE LINE VALENTIA FV5 30 KV |
EDIP SERVICIOS INDUSTRIALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
PRELIMINARY PROJECT HIGH VOLTAGE AIRLINE EVACUATION MUELA - VALENTIA - GAUSSA |
EDIP SERVICIOS INDUSTRIALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
NEW RONDA I PROJECT REQUIREMENTS |
EDIP SERVICIOS INDUSTRIALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
PROJECT HIGH VOLTAGE AERIAL LINE SUBSTATION MAGERIT TO PROMOTORES IN SAN SEBASTIAN DE LOS REYES 400 kV |
EDIP SERVICIOS INDUSTRIALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
220 KV EVACUATION LINE IN THE MUNICIPAL TERM OF SEGORBE TO THE VALL DUXIO SUBSTATION |
EDIP SERVICIOS INDUSTRIALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
SETBACK OF A MEDIUM VOLTAGE OVERHEAD LINE FOR THE CONSTRUCTION OF A PHOTOVOLTAIC PLANT IN MANZANARES |
ELECTRICIDAD JESUS BARCENAS S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
LAYOUT OF SUPPORTS FOR THE NEW POSITION OF THE 132 KV LINE IN THE ELECTRICAL SUBSTATION OF MADRIDEJOS |
ELECTRICIDAD JESUS BARCENAS S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
AERIAL LINE OF HIGH VOLTAGE 225 KV OF 12 KM IN IVORY COAST |
AEE POWER EPC S.A.U. |
2021 |
Energy |
Confidential |
Europe |
Spain |
PROCESSING AND PROJECT TRANSFORMATION CENTER 630 KVA |
BODEGAS NAVARRO S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
HIGH VOLTAGE LINE PROJECT OF 66 KV SIMPLE EVACUATION CIRCUIT OF THE 12 MW REDONDELA PHOTOVOLTAIC PLANT IN AYAMONTE |
COAGENER SOLUCIONES TÉCNICAS INTEGRALES S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
ADMINISTRATIVE PROJECT FOR THE IMPLEMENTATION OF THE EXTENSION OF THE PALACIO DE SANABRIA SUBSTATION 400/66 KV |
GABITEL SOLUCIONES TÉCNICAS S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
HIGH VOLTAGE AIRLINE PROJECT SINGLE CIRCUIT DV 220KV INTERCONNECTION BETWEEN SAIO SUBSTATION- ARDESA SUBSTATION-R.M.FISCAL |
ISASTUR INGENIERÍA S.A. |
2021 |
Energy |
Confidential |
Europe |
Spain |
HIGH VOLTAGE AERIAL LINE GARGALOIS SUBSTATION - EL CORRAL |
ISASTUR INGENIERÍA S.A. |
2021 |
Energy |
Confidential |
Europe |
Spain |
INTEGRATE SYSTEM. TREE PLANTING MANAGEMENT IN HUESCA |
JORGE S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
EVACUATION LINES FROM PE AND FV DESMA TO THE VILLALBA DE REE SUBSTATION |
ISASTUR INGENIERIA S.A. |
2021 |
Energy |
Confidential |
Europe |
Spain |
TENDER PROJECT FOR A 20 KV EVACUATION LINE PALANCAS WIND FARM |
ISASTUR INGENIERIA S.A. |
2021 |
Energy |
Confidential |
Europe |
Spain |
DRIFT OF A SECTION OF A 15 KV HIGH VOLTAGE OVERHEAD LINE OF 1.7 KM LENGTH |
VITA GESTION DE PROYECTOS S.L. |
2021 |
Energy |
Confidential |
Europe |
Spain |
Expert report at the request of a party in the contentious-administrative procedure 461/20 followed against the approval of the MPG "Madrid Nuevo Norte" |
DISTRITO CASTELLANA NORTE S.A. (DCN) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Technical assistance for the integration of environmental issues in the urbanization and infrastructure projects of Madrid Nuevo Norte. Phase 1 |
DISTRITO CASTELLANA NORTE S.A. (DCN) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Study of birds and bats prior to the promotion of two photovoltaic solar plants in the municipalities of La Mudarra and Medina de Rioseco, province of Valladolid (Castilla y León). |
Eco Energy World Ltd. (EEW) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Extraordinary support service in Environmental Engineering for analysis of Environmental Monitoring files of energy infrastructures in Galicia |
Enel Green Power Galicia (Renewables Energies Iberia) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Assistance in the modification of the Integrated Environmental Authorization of a waste storage plant in Huércal de Almería (Almería) |
ERTSOL, S.A. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Assistance for the adaptation to the best available technologies of a battery manufacturing plant in Azuqueca de Henares, Guadalajara |
EXIDE TECHNOLOGIES, S.L.U |
2021 |
Environment |
Confidential |
Europe |
Spain |
Assistance for the adaptation to the best available technologies of a battery manufacturing plant in Manzanares, Ciudad Real |
EXIDE TECHNOLOGIES, S.L.U |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Risk Analysis for an electric accumulator manufacturing plant in Azuqueca de Henares (Guadalajara) |
EXIDE TECHNOLOGIES, S.L.U |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Risk Analysis of a lead battery factory in Manzanares, Ciudad Real. |
EXIDE TECHNOLOGIES, S.L.U |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Monitoring Programs for the 132 kV "Lodoso" and "Marmellar" Evacuation Power Line to the "La Coculina" SET in Burgos. Exploitation phase. |
Exus Management Partners, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental monitoring and surveillance plans in the exploitation phase of the Marmellar Wind Farm. Located in Burgos |
Exus Management Partners, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Monitoring Program for the ?Cuesta Mañera?, ?La Muñeca? and ?Alconada? wind farms, in the TM of AMPUDIA (Palencia). exploitation phase |
Exus Management Partners, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Modification of the Study of Cumulative and Synergistic Effects in Solar Plants and their evacuations to the Renedo 220 Junction (Valladolid) |
Fotovoltaica Zarafot 4, SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Avifauna and Chiroptera study prior to the promotion of three photovoltaic solar plants in the "Nudo Valdecarretas" (Zamora) |
Green RIC Energy, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
FEASIBILITY REPORTS AND TECHNICAL ENVIRONMENTAL DUE DILIGENCE IN RELATION TO 18 RENEWABLE ENERGY PROJECTS IN SPAIN |
Hanwha Q CELLS GmbH |
2021 |
Environment |
Confidential |
Europe |
Spain |
Technical assistance for the design and implementation of an Environmental Management System according to ISO 14001 two poultry farms in the province of León |
Huevos León S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Analysis of environmental risks of an integrated poultry complex in Ferral del Bernesga (León) |
Huevos León S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Legal compliance audit of two IKEA logistics centers in Tarragona |
IKEA Ibérica S.A. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Risk Analysis of a WEEE recycling plant in the province of León |
ILUNION RECICLADOS, S.A |
2021 |
Environment |
Confidential |
Europe |
Spain |
Technical Assistance for the preparation of the Environmental Risk Analysis of a WEEE plant in Osorno (Palencia) |
Industria del Reciclaje de RAEEs S.L. (INDURAEES) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental pre-feasibility study for the development of the PSFV "Portilla" in the TM of Valencia de Don Juan (León) and "La Tapiada" in the TM of Valverde del Majano (segovia) |
Arconi Solutions, S.L.U. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Report on compliance with the End of Waste Condition criteria for aluminum concentrate from the BEFESA physicochemical process |
BEFESA ALUMINIO S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Avifauna and bats study for the Environmental Impact Study of PE "La Aldea" in Aldeanueva de Ebro (La Rioja) |
Boreas Eólica 2, S.A. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Landscape integration study of the La Aldea wind farm, for the urban authorization procedure |
BOREAS TECNOLOGÍA, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Initiation document for the environmental assessment of the 161 MW Carrión PE and its evacuation in the province of Palencia |
BOREAS TECNOLOGÍA, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Initiation Document for the environmental assessment of the 180 MW PE Grijota in the province of Palencia |
BOREAS TECNOLOGÍA, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Initiation document for the environmental evaluation of the PPEE "La Garita" and "Ureño" and their evacuation lines (Cantabria) |
BOREAS TECNOLOGÍA, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Simplified Environmental Impact Assessment and Repercussions Report on the RN2000 of the Cerro Aire wind farm in Campoo de Yuso (Cantabria) |
BOREAS TECNOLOGÍA, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Risk Analysis of a pet food manufacturing plant in Fuensaldaña, Valladolid |
CD FOODS SPAIN, S.A. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Definition of a methodology for calculating statistics on consumption, waste generation and recycling of plastics in Spain |
CICLOPLAST, S.A. |
2021 |
Environment |
Confidential |
Europe |
Spain |
ENVIRONMENTAL MANAGEMENT SERVICE OF THE ROAD NETWORK PROJECT FOR THE PLOT CONCENTRATION OF THE LA POVEDA IRRIGATION AREA (FUENTIDUEÑA DE TAJO TM), CO-FINANCING WITH FEADER. |
Consejería de Medio Ambiente, Ordenación del Territorio y Sostenibilidad. Comunidad de Madrid |
2021 |
Environment |
Confidential |
Europe |
Spain |
EXPERT REPORT ON THE "NUEVA JULIA" OPEN PIT COAL EXPLOITATION IN THE CABRILLANES AND VILLABLINO MUNICIPALITIES (LEÓN) |
Coto Minero Cantábrico, S.A |
2021 |
Environment |
Confidential |
Europe |
Spain |
Technical Assistance for the legalization of a vehicle decontamination center, in the TM of San Cristóbal de Entreviñas (Zamora) |
DESGUACE SAN CRISTÓBAL, S.L (Casquero) |
2021 |
Environment |
Confidential |
Europe |
Spain |
ASSISTANCE FOR THE PROCESSING OF THE SUBSTANTIAL MODIFICATION OF A SLAUGHTERHOUSE AND CUTTING ROOM FOR POULTRY IN ONZONILLA, LEÓN |
JAVIER CALVO LISTE (UNELSA INGENIEROS) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental impact study of the exploitation of aggregates and adaptation of land for forest plantation in the TM of Cabreros del Río (León) |
Junta Vecinal de Cabreros del Río |
2021 |
Environment |
Confidential |
Europe |
Spain |
Specialized technical assistance and environmental consulting on demand to a company in the waste sector in Alcalá de Henares |
LASERCART MADRID, S.L |
2021 |
Environment |
Confidential |
Europe |
Spain |
Analysis of environmental risks of a manufacturing plant for wind turbine blades located in the Ponferrada tm, León |
LM WIND POWER SPAIN SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Technical assistance in the revision of the AAI regarding the current regulations on waste and for its adaptation to the MTDs in the hazardous and non-hazardous waste treatment plant located in the municipality of Matapozuelos |
M FERRICOS 9, S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Preparation of a simplified Synergistic and Cumulative Effects Study for the processing of two photovoltaic plants located in the municipality of Valle de las Navas (Burgos province) |
Movimiento Azimutal, S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Execution of the Environmental Surveillance Plan in the construction phase of the wind farms and evacuations of the 667 Naturgy Plan in the province of Valladolid: MUDARRA block |
Naturgy Energy Group, S.A |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study of the Valverde Wind Farm (Valladolid) |
NATURGY RENOVABLES, S.L.U |
2021 |
Environment |
Confidential |
Europe |
Spain |
ENVIRONMENTAL PRE-FEASIBILITY STUDY FOR THE PROMOTION OF A REVERSIBLE HYDROELECTRIC POWER PLANT AND ITS EVACUATION LAAT IN THE MUNICIPALITY OF CUBILLOS DEL SIL (LEÓN) |
NEXER SOLAR SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Surveillance of the Magaz Wind Farm and its evacuation line in Palencia. Exploitation Phase. Extension 2020-21 |
Parque Eólico Magaz SLU |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental processing of a 10 MW photovoltaic solar plant in Soto del Cerrato (Palencia) |
Pío Cámara, S.A. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Strategic Environmental Document of the "Regional Project for the Industrialization of Industrial Land" in Medina del Campo (Valladolid) |
Planz Planeamiento Urbanístico SLP |
2021 |
Environment |
Confidential |
Europe |
Spain |
Strategic Environmental Document of the modification of the Partial Plan of sector S1 of the industrial estate "El Bayo" in Cubillos del Sil (León) |
Planz Planeamiento Urbanístico SLP |
2021 |
Environment |
Confidential |
Europe |
Spain |
Strategic Environmental Document of the "WAREHOUSE NISSAN REGIONAL INTEREST PROJECT" in the Ávila CyLoG enclave |
Planz Planeamiento Urbanístico SLP |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental risk analysis of a non-hazardous waste recovery plant in the province of León |
Recuperación Materiales Diversos, S.A (RMD) |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Risk Analysis of a hazardous and non-hazardous waste management facility in the province of Valladolid |
RECUPERACIONES ISCAR, S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental technical assistance for the adaptation of the environmental impact assessment files of three photovoltaic plants to be processed before the MITERD in the Nudo Tordesillas (Valladolid) |
Ric Sun España, SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental processing of the modification of the double circuit section of the 132 kV evacuation power line of the Boedo 1, Boedo 2 and OPDE Herrera photovoltaic plants in the Herrera de Pisuerga tm (Palencia) |
Ric Sun España, SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Study of cumulative and synergistic effects at the Zaratán 220 junction (Valladolid) |
Ric Sun España, SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Avifauna study for the promotion of a photovoltaic plant in the municipality of Poza de la Vega, for its evacuation to the Velilla de Río Carrión node (Palencia) |
Ric Sun España, SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental technical assistance for the adaptation of the environmental impact assessment files of three photovoltaic plants to be processed before the MITERD in the Zaratán 220 Junction (Valladolid) |
Ric Sun España, SL |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental documentation required by the Ministry of Ecological Transition, regarding the processing of the Administrative Authorization for Construction of the Sabinar-HIVE Photovoltaic Solar Plant |
SABINAR HIVE, S.L. |
2021 |
Environment |
Confidential |
Europe |
Spain |
Environmental Impact Study and Processing of the Expansion Solar Plant of Sabinar HIVE (80Mw) in TM of Alarcón (Cuenca) |
SABINAR HIVE, S.L. |
2021 |
Environment |
Confidential |
Europe |
Ukraine |
ANALYSIS OF DSO NETWORK MODERNIZATION INVESTMENTS |
USAID |
2021 |
Management Consulting |
Medium |
Europe |
Ukraine |
Power Factory Model Validation |
USAID |
2021 |
Management Consulting |
Large - Multiannual |
Europe |
Ukraine |
Ukraine Energy Security Project (UESP) |
USAID |
2021 |
Management Consulting |
Small |
Europe |
Ukraine |
SURVEY ON WORLDWIDE EXPERIENCE ON PRACTICES FOR PROTECTION OF VULNERABLE CUSTOMERS IN THE GAS SECTOR |
USAID |
2021 |
Management Consulting |
Medium |
Europe |
Ukraine |
Gas Market Monitoring & Surveillance under REMIT |
USAID |
2021 |
Management Consulting |
Small |
Europe |
United Kingdom |
Technical Advisory Services for Wind Offshore Project in Scotland |
Private Entity |
2021 |
Energy |
Medium |
Europe |
Albania |
Investment and Network Development Plan for the Electricity Transmission Sector in Albania |
Private Entity |
2020 |
Energy |
Small |
Europe |
Bosnia and Herzegovina |
Feasibility Study and Preliminary Design for Utility Scale PV Plant in Bosnia and Herzegovina |
Private Entity |
2020 |
Energy |
Small |
Europe |
Kosovo |
Support on implementing the 3rd Energy Package with focus on Energy Efficiency and Renewables |
European Commission |
2020 |
Energy |
Small |
Europe |
Northern Macedonia |
Consulting Services for Implementation of Support for Solar Photovoltaic and Wind Power Plants Programme |
Private Entity |
2020 |
Energy |
Small |
Europe |
Northern Macedonia |
Supervision and consulting services for the Oslomej photovoltaic (PV) power plant |
Private Entity |
2020 |
Energy |
Small |
Europe |
Northern Macedonia |
Technical consultant - Electricity Markets: Cebren Pumped Storage Hydropower PPP Project |
International Finance Corporation (IFC) |
2020 |
Energy |
Small |
Europe |
Spain |
CSP-TA: Technical Due Diligence and Site Visit for ENCE Assets in Spain |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
Owner's Engineering Services for Portfolio of Wind Farms in Spain |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
Technical Due Diligence for M&A 359MW PV Project - Magallon |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
Wind ES: Red Flag Analysis 180 MW Wind Farm in Spain |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
PV-TA: Market study for PV asset management in Europe |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
CMMS JASPER IBERINCO PO 4500040532 |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
WIND-ES: Birds and Bats Preliminary Desktop Assessment for 2 Wind Farms (Lerida 150MW, Tarragona 250MW) in Spain |
Private Entity |
2020 |
Environment |
Small |
Europe |
Spain |
CSP-TA: Hydrogen build up event in 3 CSP Plants in Spain |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
PV-ES: ROOFTOP PV PLANT IN SEVILLE |
Private Entity |
2020 |
Energy |
Small |
Europe |
Spain |
Technical assistance for the environmental processing of a 30 MW solar plant and its evacuation power line in the province of Zamora |
FOTOWATIO RENEWABLE VENTURES |
2020 |
Environment |
Small |
Europe |
Spain |
Supervisión anual de funcionamiento para 4 plantas PV |
Sunia Energy |
2020 |
Energy |
Small |
Europe |
Spain |
Execution of the Environmental Surveillance Plan in the construction phase and previous works for the Ampliación del Hierro Wind Farm, province of Zamora. |
Gas Natural Fenosa |
2020 |
Environment |
Small |
Europe |
Spain |
ESTUDIO DE TRANSPOSICION DE CONDUCTORES EN L/400 KV EVACUACION PV TALAYUELA (CACERES) |
PRODIEL |
2020 |
Energy |
Small |
Europe |
Spain |
DETAIL ENGINEERING AND AS BUILT L/132 KV EVACUATION AND PV ALMOCHUEL (ZARAGOZA) |
PRODIEL |
2020 |
Energy |
Small |
Europe |
Spain |
TOPOGRAPHIC SURVEY AND GEORRADAR LINES 132 KV DC/SC SET ALMOCHUEL-SET ESCATRON AND SET ALMOCHUEL-SET HIJAR (ZARAGOZA) |
PRODIEL |
2020 |
Energy |
Medium |
Europe |
Spain |
CONSULTANCY CONTRACT PAKISTAN INTERNATIONAL TRANSMISSION LINE ENGINEER |
Mercados Aries International MAI |
2020 |
Energy |
Medium |
Europe |
Spain |
Technical Due Diligence for M&A 359MW PV Project - Magallon, para GALP ENERGIA ESPAÑA, S.A.U |
Galp Energia S.A. |
2020 |
Energy |
Small |
Europe |
Spain |
Drafting of the environmental document for the Simplified Environmental Impact Assessment for the management of non-hazardous waste in a WWTP in the municipality of Madrid |
Suez |
2020 |
Environment |
Small |
Europe |
Spain |
PRELIMINARY PROJECT L/220 KV EVACUATION PE 49.5 MW FIAL DAS CORZAS |
AYESA |
2020 |
Energy |
Small |
Europe |
Spain |
Supervision of transmission line 220 kV I/O Regoelle L220 kV Meson do Vento - Dumbria |
Red Electrica de España (REE) |
2020 |
Energy |
Small |
Europe |
Spain |
Simplified environmental impact assessment of the PV Auriga Solar solar plant in Renedo de Esgueva (Valladolid) and additional procedures |
Solaria |
2020 |
Environment |
Small |
Europe |
Spain |
Fauna studies in the surroundings of the 80 MWp Pegasus solar photovoltaic plant in the municipality of Valladolid (Valladolid) |
Solaria |
2020 |
Environment |
Small |
Europe |
Spain |
Archaeological monitoring plan for solar plants in the province of Salamanca |
Solaria |
2020 |
Environment |
Small |
Europe |
Spain |
Execution of the environmental and archaeological surveillance plan for solar plants in the province of Valladolid |
Solaria |
2020 |
Environment |
Small |
Europe |
Spain |
Avifauna and bats studies in the surroundings of the Nudo de Velilla Wind Farms (Palencia) |
GAMESA |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance for environmental feasibility analysis of sites for the promotion of energy production infrastructures in Spain |
Vector Cuatro group |
2020 |
Environment |
Small |
Europe |
Spain |
Permanent Environmental Technical Assistance to a company in the energy sector in the province of León |
SILVANO, S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Drafting of the Decommissioning Plan for the El Poleo Wind Farm |
WPD PARQUE EÓLICO EL POLEO S.L.U. |
2020 |
Environment |
Small |
Europe |
Spain |
Drafting of the Decommissioning Plan for the Las Panaderas Wind Farm |
WPD PARQUE EÓLICO LAS PANADERAS S.L.U. |
2020 |
Environment |
Small |
Europe |
Spain |
Drafting of the Navillas Wind Farm Decommissioning Plan |
WPD Parque Eólico Navillas S.L.U. |
2020 |
Environment |
Medium |
Europe |
Spain |
LAYOUT OF SUPPORTS LAT 45 KV ALARCOS - PIEDRABUENA UFD |
ELECTRICIDAD JESUS BARCENAS S.L. |
2020 |
Energy |
Small |
Europe |
Spain |
EIEL 2019 UPDATE AND CARTOGRAPHY OF THE PROVINCE OF CIUDAD REAL. FIRST PHASE |
AGROAMBIENTAL BULLAQUE S.L. |
2020 |
Energy |
Small |
Europe |
Spain |
HIGH VOLTAGE LINE STRUCTURALLY CONFIGURED FOR 220KV CIRCUITS WITH THE POSSIBILITY OF BEING MIXED |
ENERGIA Y DESARROLLO TECNOLOGICO S.L. |
2020 |
Energy |
Small |
Europe |
Spain |
LAYOUT STUDY FOR THE 132 KV BUSTATUR-VIRTUS LINE FROM A LIDAR TOPOGRAPHY |
ISASTUR INGENIERIA S.A. |
2020 |
Energy |
Small |
Europe |
Spain |
STUDY OF ALTERNATIVES WITH PROPOSALS FOR ACTIONS TO AVOID SHORT CIRCUIT CAUSED BY THE GENERATION OF ICE SLEEVES ON THE 50 KV RIZA HIGH VOLTAGE AERIAL LINE (RIERA-PROAZA) |
ISASTUR INGENIERIA S.A. |
2020 |
Energy |
Small |
Europe |
Spain |
Technical assistance in the revision of the AAI for adaptation to the Best Available Techniques (MTDs) of the Valladolid Waste Treatment Center |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2020 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance of the Magaz Wind Farm and its evacuation line in Palencia. Exploitation Phase. Extension 2019-20 |
Exus Management Partners, S.L |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance to RES associates subject to Integrated Environmental Authorization regarding BREF/MTDs |
FEDERACIÓN ESPAÑOLA DE LA RECUPERACION Y EL RECICLAJE (FER) |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the processing of a substantial modification of the AA of the Tudela de Duero hazardous and non-hazardous waste management plant |
Ferrovial Servicios, S.A. (Ferroser) |
2020 |
Environment |
Small |
Europe |
Spain |
Specialized technical assistance and on-demand environmental consulting for a sludge treatment facility in the municipality of Getafe (Madrid) |
FERTILIZANTES MARTÍN, S.A |
2020 |
Environment |
Small |
Europe |
Spain |
Processing of the environmental evaluation of the photovoltaic solar plant "Muelas" in the province of Valladolid |
GENERADORA ELECTRICA VERDE XII, S.L (Abei Energy) |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the processing of the request for consideration of the ashes produced in the Garray biomass plant as a by-product in accordance with Law 22/2011, and REACH registration of the substance |
GESTAMP BIOMASS |
2020 |
Environment |
Small |
Europe |
Spain |
Avifauna and Chiroptera study prior to the promotion of the "Nudo Herrera" (Palencia) with more than 500 MW of photovoltaic solar plants |
Green RIC Energy, S.L |
2020 |
Environment |
Small |
Europe |
Spain |
Environmental legislative update of IKEA Ibérica centers |
IKEA Ibérica S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the authorization process for the modification of the environmental authorization of a WEEE plant in the province of León |
ILUNION RECICLADOS, S.A |
2020 |
Environment |
Medium |
Europe |
Spain |
Technical Assistance for the design and implementation of an Environmental Management System in an Industry of the Pharmaceutical Sector of León. |
ANTIBIÓTICOS DE LEÓN, S.L.U. |
2020 |
Environment |
Small |
Europe |
Spain |
Expert report in relation to Opinion M19-10841 issued by the INTCF in the framework of PRELIMINARY INVITATIONS No. 2019-10149-0000001 Dili. Prev. Proc. aprev. Number 425/19, relating to a certificate of initiation of proceedings for ecological crimes |
BEFESA ALUMINIO S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Assistance in the processing of the revision of the AAI for its adaptation to the BAT and justification of the waste regulations of the aluminum waste treatment facility of BEFESA ALUMINIO, SL in Valladolid |
BEFESA ALUMINIO S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Report on the condition of PAVAL and BESCOAL by-products, produced at the BEFESA ALUMINIO, SLU facilities located in Valladolid |
BEFESA ALUMINIO S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Modification of the EsIA of the Beneixama Hive 50 Mw Photovoltaic Solar Plant due to a new layout of the evacuation LAT. |
Beneixama Hive S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Ordinary Environmental Impact Assessment and Repercussions Report on the Natura 2000 Network of the Cerro Airo Wind Farm, located in the municipality of Campoo de Yuso (Cantabria). |
BOREAS TECNOLOGÍA, S.L |
2020 |
Environment |
Small |
Europe |
Spain |
Technical Assistance for the processing of the authorization of manager of hazardous waste from machinery in the province of León |
CENTRO HOMOLOGADO DE RECUPERACIÓN DE MAQUINARIA, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Environmental monitoring of the construction phase of the works of the deposits of the CASRAMA SUR system: Villanueva de Perales and Villamantilla (Madrid) |
Cobra Instalaciones y Servicios, S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Assistance in the processing of a construction and demolition waste treatment facility (RCD) in the municipality of Golmayo (Soria) |
CONSTRUCCIONES BELTRAN MOÑUX SLU |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the processing of the manager's authorization and the environmental license for the new facilities of a non-hazardous waste manager in the Vicolozano Industrial Estate (Ávila). |
CRILOPARI, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Assistance for the generation of a Proposal document for innovative environmental monitoring measures, to facilitate decision-making in the field of metal mining from the beginning of the activity until its rehabilitation. 0284_ESMIMET_3_E. |
D.G. Energía y Minas - Consejería de Economía y Hacienda (JCYL) |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the simplified environmental impact assessment of the modification project of a wood panel manufacturing plant |
KRONOSPAN, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Permanent Environmental Technical Assistance to a board manufacturing company in Burgos |
KRONOSPAN, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Avifauna study in the surroundings of the Valverde Wind Farm in the municipalities of Valverde de Campos, Castromonte, Villabrágima and Tordehumos, in the province of Valladolid. |
Naturgy Energy Group, S.A |
2020 |
Environment |
Small |
Europe |
Spain |
Drafting of the executive project for the dismantling and environmental restoration of the Wind Farm "Amplification of Nerea" |
NATURGY RENOVABLES, S.L.U |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the processing of the authorization of non-hazardous waste manager of a facility in Torre del Bierzo, León. |
Operadora de Logística Portuaria y Ferrocarril, s.l |
2020 |
Environment |
Small |
Europe |
Spain |
Fauna raid and Environmental Monitoring Plan under construction for a 15 MW photovoltaic plant in Medina del Campo (Valladolid) |
Pío Cámara, S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Fauna study of the PV Hontoria 10 photovoltaic solar plant, in Hontoria del Cerrato (Palencia) |
Pío Cámara, S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Processing of the Environmental Assessment of the 13 Roeles Norte Photovoltaic Solar Plant in the municipality of Medina del Campo (Valladolid) |
Pío Cámara, S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document of the "SPECIAL INFRASTRUCTURE PLAN IN THE ENVIRONMENT OF SUD 11 DE PONFERRADA" |
Planz Planeamiento Urbanístico SLP |
2020 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Assessment of the Special Supramunicipal Plan "Granja Conchita" (Valladolid) |
Planz Planeamiento Urbanístico SLP |
2020 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the authorization of a manager of a wood waste recovery activity in the province of Valladolid |
RECICLAJES ROMAIZ, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Environmental impact assessment and authorization of the RCD transfer and classification plant in Arganda del Rey (Madrid) |
RECUP ARGAN SL |
2020 |
Environment |
Small |
Europe |
Spain |
Technical Assistance for the processing of the modification of the environmental authorization of a manager of hazardous and non-hazardous waste in the province of Valladolid |
RECUPERACIONES ISCAR, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Permanent technical assistance to a manager of hazardous and non-hazardous waste in the province of Valladolid |
RECUPERACIONES ISCAR, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Environmental Authorization of a hazardous waste management facility in Onzonilla, León. |
RECUPERACIONES RECIPACAR, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Processing of a CO2 production plant in a biomass facility in Garray (Soria) |
S.E CARBUROS METÁLICOS, S.A. |
2020 |
Environment |
Small |
Europe |
Spain |
Hydrological study in the surroundings of the Sabinar-Hive Photovoltaic Solar Plant |
SABINAR HIVE, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Environmental Impact Study of a 200 Mw Photovoltaic Solar Plant in Cuenca |
SABINAR HIVE, S.L. |
2020 |
Environment |
Small |
Europe |
Spain |
Teaching of the Technician Course in Environmental Impact Assessment within the Master in Environmental Management in the Company 2019-2020 |
Instituto Superior Medio Ambiente, S.L. (ISM) |
2020 |
Environment |
Small |
Europe |
Switzerland |
Visit Baden for Performance Model |
Megalim Solar Power Ltd |
2020 |
Management Consulting |
Medium |
Europe |
Ukraine |
Technical Due Diligence for 80 MW Smerechanska Wind Power Project in Ukraine |
Private Entity |
2020 |
Energy |
Medium |
Europe |
Ukraine |
Support to the Implementation of the Reconstruction of the Public Lighting System in Mariupol |
EUROPEAN INVESTMENT BANK (EIB) |
2020 |
Energy |
Medium |
Europe |
Finland |
Role of hydro power in the Finnish energy system |
Private Entity |
2019 |
Management Consulting |
Medium |
Europe |
Lithuania |
Consulting services for the procurement of implementation solution of AMI Mass Rollout in Lithuania |
Private Entity |
2019 |
Energy |
Small |
Europe |
Mozambique |
Training II of Feasibility Study for the Mozambique – Zambia Interconnector |
Private Entity |
2019 |
Management Consulting |
Small |
Europe |
Multi-country |
Consulting services for the IDB Invest Green Transmission Lines (GTL) Standard |
IDB Invest |
2019 |
Energy |
Small |
Europe |
Slovenia |
Small battery specification support |
Private Entity |
2019 |
Energy |
Small |
Europe |
Spain |
PV-TA: Nota Técnica Circular Puerto Lumbreras (Spain) |
Private Entity |
2019 |
Energy |
Small |
Europe |
Spain |
Multidisciplinary Engineering Studies |
Private Entity |
2019 |
Energy |
Small |
Europe |
Spain |
ADAPTACIÓN IBERDROLA TALAYUELA I & II |
Private Entity |
2019 |
Energy |
Small |
Europe |
Spain |
COMPLETE PERMITTING SERVICES FOR THE DEVELOPMENT UP TO 150 MW IN SPAIN |
Private Entity |
2019 |
Energy |
Medium |
Europe |
Spain |
Promoción PV en España |
Private Entity |
2019 |
Energy |
Small |
Europe |
Spain |
Independent Technical Advisory Services for the yearly O&M supervision of 3 PV plants in Spain |
Private Entity |
2019 |
Energy |
Small |
Europe |
Spain |
PV-TA: Vendor Due Diligence Services for a 20 MW PV Project in Spain (Luzentia) |
Banco Sabadell |
2019 |
Energy |
Small |
Europe |
Spain |
Environmental Impact Assessment and Integrated Environmental Authorization of a 49.9 MWe biomass-based electric power generation plant in the TM of Guardo (Palencia) |
Forestalia Renovables S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the process of authorization of actions on livestock roads, Public Utility Forests, authorization of felling and archaeological offprint of the PPEE Carratorres, Mirabel, San Blas and Teso |
Gas Natural Fenosa |
2019 |
Environment |
Small |
Europe |
Spain |
Studies of the quantitative evaluation of the environmental impact that the modification would have on assumptions of article 19.11 of Law 7/2007 of July 9, (Affection to a protected natural space or RN2000). Anchuricas and La Vieja dams. |
IBERDROLA |
2019 |
Environment |
Small |
Europe |
Spain |
Report on the repercussions on the Natura 2000 Network of the actions at the Valecañas and Torrejón Hydroelectric Power Plants (Monfragüe, Cáceres) |
IBERDROLA |
2019 |
Environment |
Small |
Europe |
Spain |
Drafting of the environmental document for the Simplified Environmental Impact Assessment request for a non-hazardous waste management center in a WWTP in the municipality of Madrid. |
Suez |
2019 |
Environment |
Small |
Europe |
Spain |
Right of way for project of transmission line 220 kV I/O Puente Bibey L220 kV Conso - Trives |
Red Electrica de España (REE) |
2019 |
Energy |
Small |
Europe |
Spain |
Environmental processing of the Tordesillas III solar plant in the province of Valladolid |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental processing of the Tordesillas II Solar Plant in the province of Valladolid |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental processing of the Santiz II solar plant in the province of Salamanca |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental impact study of a 30 MW solar plant in the municipality of Tordesillas (Valladolid) |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Complementary documentation and preliminary draft of compensatory measures for the photovoltaic plants of Santiz I, II and III |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental impact study of the PV GULEVE solar plant - PALACIOS DEL ARZOBISPO I (Salamanca) |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Impact Study of the Santiz I solar plant in the municipality of Valdelosa (Salamanca) |
Solaria |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance Plan in the Construction Phase of the La Casetona and Ballestas Wind Farms in Burgos. |
GAMESA |
2019 |
Environment |
Small |
Europe |
Spain |
Drafting of the Environmental Sustainability Report of the partial plan of the industrial sector SUD-I.1 of the General Urban Planning Plan of the municipality of Laredo (Cantabria) |
UTE David Andrés Moro - Eduardo Sánchez Sánchez |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental feasibility study for the implementation of solar plants in Palacios de Sanabria and/or Mombuey (Zamora) |
VIGIERS PLUS PROJECT, S.L.U. |
2019 |
Environment |
Small |
Europe |
Spain |
Processing of the environmental communications of the wind farms "El Poleo", "Las Panaderas", "Navillas" and the private evacuation position in the SET Las Mazuelas. |
WPD Ibervento Infraestructuras, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Processing of authorizations for forestry and livestock trails prior to the construction phase of the El Poleo, Las Panaderas, La Mudarra Norte, Corralnuevo, Navillas and Navabuena Norte wind farms, located in the province of Valladolid |
WPD Ibervento Infraestructuras, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
400kV HV Transmission Line Feasibility Study |
NEW HORIZONS IN INFRAESTRUCTURE OF DENMARK I/S |
2019 |
Energy |
Small |
Europe |
Spain |
Environmental monitoring services in the operation phase of the AT 45 kv overhead power line "CH Ferreras-STR San Isidro" in the municipalities of Boñar and Puebla de Lillo (León) |
Diputación Provincial de León |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental evaluation of a photovoltaic plant promoted by 13 Roeles in Medina del Campo (Valladolid) |
Emeuve Energía SLU |
2019 |
Environment |
Small |
Europe |
Spain |
Expert report on the impact of the Expansion of La Ruya wind farm on the landscape and Cultural Heritage |
Eólica de La Ruya, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Impact Study of an urban waste treatment plant in the municipality of Benferri (Alicante) |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2019 |
Environment |
Small |
Europe |
Spain |
Analysis of Environmental Risks for the constitution of the obligatory financial guarantee in a lead recovery plant for the second fusion in the province of Soria |
EXIDE TECHNOLOGIES, S.L.U |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Surveillance of the Magaz Wind Farm and its evacuation line in Palencia. Exploitation Phase. Extension 2018-19 |
Exus Management Partners, S.L |
2019 |
Environment |
Small |
Europe |
Spain |
DRAFTING OF THE SPECIFIC PLAN FOR THE ENVIRONMENTAL RESTORATION OF THE AMPLIACIÓN DEL HIERRO WIND FARM. Zamora |
FERROVIAL AGROMAN S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
Support in drafting the offer for the exploitation of the Gomecello CTR: adaptation of the exploitation plan to the BATs in terms of waste |
FOMENTO DE CONSTRUCCIONES Y CONTRATAS S.A. (FCC) |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Risk Analysis of a biopharmaceutical production plant in León |
GH GENHELIX S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
Preparation of a Guide for the Management of domestic and commercial waste |
Gobierno de Aragón. Departamento de Desarrollo Rural y Sostenibilidad. Dirección General de Sostenibilidad |
2019 |
Environment |
Small |
Europe |
Spain |
Analysis of environmental and technical requirements for the definition of wind power sites in the 9 provinces of Castilla y León |
Green Capital Power, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Assistance in the processing of environmental permits for a vermicompost production plant in the province of Madrid |
Green Humus S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Technical Assistance in the Processing of the Substantial Modification of the Environmental Authorization of a poultry complex of laying hens and egg classification center in tm Santas Martas (León) |
Huevos León S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Technical and administrative assistance in promoting projects 2017-18 |
Ignacio Crespo Gutés |
2019 |
Environment |
Small |
Europe |
Spain |
Review of the Environmental Self-Assessment procedure of IKEA Ibérica centers, and legislative update system |
IKEA Ibérica S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
Preparation of the base soil report for the expansion of a WEEE plant in La Bañeza (León) |
ILUNION RECICLADOS, S.A |
2019 |
Environment |
Small |
Europe |
Spain |
Technical support services for the preparation of environmental documents. Lot 1 Environmental documents of projects: ENVIRONMENTAL DOCUMENT OF THE "N-550 ROAD. ORDES BYPASS (A CORUÑA)" |
INGENIERIA Y ECONOMIA DEL TRANSPORTE, S.A.(INECO) |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Risk Analysis to determine the amount of the financial guarantee of a pharmaceutical production plant in León. |
4D Pharma León S.L.U |
2019 |
Environment |
Small |
Europe |
Spain |
Design and implementation of an environmental management system in an industrial automation design and manufacturing company in the province of Burgos |
ASTI - AUTOMATISMOS Y SISTEMAS DE TRANSPORTE INTERNO S.A.U |
2019 |
Environment |
Small |
Europe |
Spain |
Application for an environmental license for the project to expand facilities in Madrigalejo, and other legalization processes for the activity |
ASTI - AUTOMATISMOS Y SISTEMAS DE TRANSPORTE INTERNO S.A.U |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the processing of the authorization as a waste management facility of the City Council of Cantalejo, Segovia |
Ayuntamiento de Cantalejo |
2019 |
Environment |
Small |
Europe |
Spain |
Report on compliance with the End of Waste Condition criteria of the fraction "cut 1" of Befesa's SPL |
BEFESA ALUMINIO S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Hydrological study of plot in Beneixama (Alicante) for PSFV Beneixama-Hive SL. |
Beneixama Hive S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance services for the environmental evaluation of projects and plans. lot 2 |
Canal de Isabel II Gestión S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
PROJECT FOR THE CONSTRUCTION OF THE NORTH ARTERY FOR THE SUPPLY OF POTABLE WATER TO THE MADRID-BARAJAS GENERAL AIRPORT SYSTEM |
Canal de Isabel II, S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
Support for the adaptation of industrial facilities in Castilla y León to the Best Available Technologies |
Consejería de Fomento y Medio Ambiente (JCyL) - D.G. Calidad y Sostenibilidad Ambiental |
2019 |
Environment |
Small |
Europe |
Spain |
Study of the technical and legal requirements for the use of recycled aggregates from the recovery of construction and demolition waste |
Consejería de Fomento y Medio Ambiente (JCyL) - D.G. Calidad y Sostenibilidad Ambiental |
2019 |
Environment |
Small |
Europe |
Spain |
Advice on environmental authorization files |
Consejería de Fomento y Medio Ambiente (JCyL) - D.G. Calidad y Sostenibilidad Ambiental |
2019 |
Environment |
Small |
Europe |
Spain |
Identification of the environmental impacts of metallic mining, and proposal of preventive and corrective control measures, within the framework of the ESMIMET project |
D.G. Energía y Minas - Consejería de Economía y Hacienda (JCYL) |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the preparation of the soil characterization study due to the cessation of activity of a waste manager in the province of Salamanca |
DESGUACES MONTERO, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Strategic Environmental Document of the Special Plan Camino de Santiago (PECAS) in the tm of Santa Marina del Rey (León) |
Javier Martínez, Arquitecto y Asociados, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Analysis of Environmental Risks to determine the amount of the Financial Guarantee of a chemical industry for the manufacture of resins and glues in Burgos |
KRONOSPAN CHEMICALS, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the calculation of the financial guarantee and environmental risk analysis of a fiberboard manufacturing industry in Salas de los Infantes, Burgos. |
KRONOSPAN MDF, s.l. |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance for updating legislation on environmental matters to a business group in the wood sector |
KRONOSPAN, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Substantial modification of the Integrated Environmental Authorization of a wood panel manufacturing plant in Burgos |
KRONOSPAN, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Analysis of environmental risks of two pharmaceutical production plants in the province of León |
Laboratorios Syva, S.A.U (Grupo Industrias Pablos, S.A., IAPSA) |
2019 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the processing of the manager authorization for a facility, in Cabanillas del Campo (Guadalajara) |
LASERCART MADRID, S.L |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Risk Analysis of a hazardous waste manager in the province of Valladolid |
M FERRICOS 9, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Diagnosis of business efficiency and improvement plan |
Metales Vela, S.L |
2019 |
Environment |
Small |
Europe |
Spain |
EXTENSION of the Avifauna, Chiroptera and Fauna Studies in general, in the area of the 169 MW PV SOLAR PLANT project IN THE MUNICIPALITIES OF VALVERDEJO, OLMEDILLA DE ALARCÓN AND ALARCÓN (Cuenca). AUTUMN and WINTER campaigns (October to March) |
OLMEDILLA HIVE, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Impact Study 169 MW Photovoltaic Solar Plant in Cuenca |
OLMEDILLA HIVE, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Avifauna study in the surroundings of the "169 MW PV SOLAR PLANT IN THE T.M OF VALVERDEJO, OLMEDILLA DE ALARCÓN AND ALARCÓN (Cuenca)". Fieldwork Autumn and Winter Campaign |
OLMEDILLA HIVE, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Assistance in the definition of mechanisms for the application of the Circular Economy to RCDs |
Persea Soluciones Ambientales S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental processing of a 3.75 MW solar plant in Villarhemosa (Ciudad Real) |
Pío Cámara, S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
Environmental Document of a Solar Plant in Medina del Campo (Valladolid) |
PLANTA FV 3 S.L.U |
2019 |
Environment |
Small |
Europe |
Spain |
Technical Assistance in the extension of the authorization of a non-hazardous waste manager in the province of Palencia |
PLÁSTICOS MAGONSA, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
REVIEW, CONTROL AND COMPLETION OF URBAN PLANNING DOCUMENTS FOR THE SPECIAL TERRITORIAL PLAN FOR THE INTEGRATED COASTAL PORT MANAGEMENT STRATEGY OF THE PRINCIPALITY OF ASTURIAS, EIGPLA. |
Principado de Asturias - Consejería de Infraestructuras, Ordenación del Territorio y Medio Ambiente |
2019 |
Environment |
Small |
Europe |
Spain |
Technical Assistance in the preparation of the necessary documentation for the Administration of a Non-Hazardous Waste manager in San Andrés del Rabanedo (León) - 2018 |
Productos Residuales C. Peláez, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Preparation of a dispersion study of atmospheric pollutants from a CO2 capture plant, in Garray (Soria) |
S.E CARBUROS METÁLICOS, S.A. |
2019 |
Environment |
Small |
Europe |
Spain |
Complementary Studies to the EsIA of the Sabinar HIVE Photovoltaic Solar Plant in Cuenca of 169 Mw |
SABINAR HIVE, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Expansion of the fauna studies in PSFV Sabinar-Hiv. Spring and summer time |
SABINAR HIVE, S.L. |
2019 |
Environment |
Small |
Europe |
Spain |
Diagnostic consultancy on the administrative and legal situation of a waste manager in the province of Valladolid |
AGERDCYL - Asociación de Gestores de RCD de Castilla y León |
2019 |
Environment |
Small |
Europe |
Spain |
Assistance in the start-up of a plant for the production of active substances from microorganisms in León |
Instituto Biomar, S.A. (Biomar Microbial Technologies) |
2019 |
Environment |
Small |
Europe |
Spain |
Development of a reference in the field of Circular Economy for the certification of organizations |
Instituto para la Producción Sostenible (IPS) |
2019 |
Environment |
Small |
Europe |
Spain |
Teaching of the Technician Course in Environmental Impact Assessment within the Master in Environmental Management in the Company 2018-2019 |
Instituto Superior Medio Ambiente, S.L. (ISM) |
2019 |
Environment |
Small |
Europe |
Ukraine |
Feasibility Study for a PV floating system in Ukraine |
Private Entity |
2019 |
Energy |
Small |
Europe |
Ukraine |
Technical Due Dilligence Services for Ingulets and Aquanova PV Plants in Ukraine |
Private Entity |
2019 |
Energy |
Medium |
Europe |
Ukraine |
Development of Regional Energy Markets in Europe and Eurasia - Bankable and Technical Feasibility Assessments of Urkenegro's Transmission Network Modernization Project |
USAID |
2019 |
Management Consulting |
Medium |
Europe |
Albania |
Feasibility study (Regulatory and Market analysis) for a 500 MW Combined Cycle Gas Turbine Independent Power Plant in Albania |
The World Bank Group |
2018 |
Management Consulting |
Small |
Europe |
Multi-country |
Technology and Market study for CSP and PV projects |
Private Entity |
2018 |
Energy |
Small |
Europe |
Spain |
Development of procedures for Photovoltaic O&M. |
Private Entity |
2018 |
Energy |
Small |
Europe |
Spain |
Due Diligence Técnica Planta Mini Hidráulica (1.3 MW) |
Aventron Ltd |
2018 |
Energy |
Small |
Europe |
Spain |
Renovación Certificación P.O.12.3 Madrigalejos |
TSK Electrónica y electricidad, S.A. |
2018 |
Energy |
Medium |
Europe |
Spain |
Environmental Impact Assessment and Integrated Environmental Authorization of a 49.5 MWe biomass-based power generation plant in the TM of Cubillos del Sil (León) |
Forestalia Renovables S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Renovación de la Certificación de Conformidad de Requisitos de respuesta frente a HT de las instalaciones de PV de conexión a la red |
Alianza Solar Iberica, S.A |
2018 |
Energy |
Small |
Europe |
Spain |
Drafting of the Plan of Compensatory Measures of the PPEE Carratorres, Mirabel, San Blas and Teso Pardo, Valladolid |
Gas Natural Fenosa |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental report on non-substantial modification of the El Hierro Expansion Wind Farm project (Zamora) |
Gas Natural Fenosa |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental report on the second non-substantial modification of the Carratorres Wind Farm project (Valladolid) |
Gas Natural Fenosa |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental report on non-substantial modification of the San Blas, Teso Pardo, Mirabel and Carratorres Wind Farm projects corresponding to the La Mudarra Nude (Valladolid) |
Gas Natural Fenosa |
2018 |
Environment |
Small |
Europe |
Spain |
Addendum to the Environmental Impact Study of the "Amplification of El Hierro" Wind Farm (Zamora) |
Gas Natural Fenosa |
2018 |
Environment |
Small |
Europe |
Spain |
Preparation of Environmental Impact Studies and additional studies of several wind farm projects and their evacuation lines in the La Mudarra knot (Valladolid) |
Gas Natural Fenosa |
2018 |
Environment |
Small |
Europe |
Spain |
RENOVACIÓN CERTIFICACIÓN P.O.12.3. FONTíVEROS |
ECOGESTIÓN DEL GUADIANA, S.L.U. |
2018 |
Energy |
Small |
Europe |
Spain |
OPGW Detailed Engineering design |
ELECNOR |
2018 |
Energy |
Small |
Europe |
Spain |
Renovación Huecos de Tensión y Mantenimiento Preventivo- Mazarrón |
MAZARRÓN FV, SL |
2018 |
Energy |
Small |
Europe |
Spain |
Corrective Maintenance Wind Farm Corral Nuevo |
Parque Eólico Corral Nuevo, S.A.L. |
2018 |
Energy |
Small |
Europe |
Spain |
Reports on the impact of the Natura 2000 Network on actions in the dams of: La Vieja (Jaén), Anchuricas (Jaén), Vallat Dam (Castellón) and Los Toranes Dam (Teruel). |
IBERDROLA |
2018 |
Environment |
Small |
Europe |
Spain |
Feasibility study of transmission line 66 kV San Antonio SS to San Jorge SS (132 kV) |
Red Electrica de España (REE) |
2018 |
Energy |
Small |
Europe |
Spain |
Project of transmission lines 220 kV I/O TL Pobla-Pujalt and Anoia-Pont de Suert in Isona SS |
Red Electrica de España (REE) |
2018 |
Energy |
Small |
Europe |
Spain |
Engineering project to modify the transmission line 400 kV Eliana SS to La Plana SS |
Red Electrica de España (REE) |
2018 |
Energy |
Small |
Europe |
Spain |
Project of transmission lines 400 kV I/O TL Sallente-Senmenat and Sallente-Calders in Isona SS |
Red Electrica de España (REE) |
2018 |
Energy |
Small |
Europe |
Spain |
Environmental feasibility study for the implementation of a solar plant in Valdelosa. Salamanca |
Solaria |
2018 |
Environment |
Small |
Europe |
Spain |
Analysis of environmental requirements for the definition of wind power sites in various provinces of Castilla y León |
GAMESA |
2018 |
Environment |
Small |
Europe |
Spain |
Plan of Compensatory Measures of the PPEE Ballestas and La Casetona, Burgos |
GAMESA |
2018 |
Environment |
Small |
Europe |
Spain |
Drafting of the report and processing for the authorization of the Ballestas and Casetona wind farms by the Burgos Cultural Heritage Commission. |
GAMESA |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Impact Studies of the Casetona and Ballestas Wind Farms in the Province of Burgos |
GAMESA |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Management Plan: Status Report of the SGMA 2016 and Phase 1 of the Biodiversity Strategy: protection of birdlife |
Viesgo |
2018 |
Environment |
Small |
Europe |
Spain |
Simplified environmental impact assessment of a RCDs plant in Alcalá de Henares (Madrid) |
Surge Ambiental, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Extension of avifauna and bat studies for new wind farms and their evacuation lines at the La Mudarra knot (Valladolid) |
WPD Ibervento Infraestructuras, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Preparation of Environmental Impact Studies and additional studies of new wind farms and their evacuation lines in the La Mudarra knot (Valladolid) |
WPD Ibervento Infraestructuras, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Assistance in hydraulic calculations for the drafting of the construction project of a storm sewer for an industrial installation in Benavente (Zamora) |
Estudio de Ingeniería Civil, S.L. (EIC) |
2018 |
Water |
Small |
Europe |
Spain |
Environmental Impact Study of an urban waste treatment plant in the municipality of San Miguel de Salinas (Alicante) |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental study of alternatives for the Addendum to the "Additional Draft Regulation of the Carrión Basin. Las Cuezas Reservoirs" |
Estudio de Ingeniería Civil, S.L. (EIC) - Delegación León |
2018 |
Environment |
Small |
Europe |
Spain |
Analysis of Environmental Risks to determine the amount of the Mandatory Financial Guarantee of a manager of hazardous and non-hazardous waste in Tenerife |
E-Waste Canarias s.l. |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Risk Analysis for the constitution of the obligatory financial guarantee in a lead recovery plant by fusion in Sant Julià del Llor i Bonmatí, province of Girona |
EXIDE TECHNOLOGIES RECYCLING SL |
2018 |
Environment |
Medium |
Europe |
Spain |
Environmental Surveillance of the Magaz Wind Farm and its evacuation line in Palencia. Exploitation Phase. Extension 2017-18 |
Exus Management Partners, S.L |
2018 |
Environment |
Small |
Europe |
Spain |
Drafting of the Decommissioning Plan for the A Xunqueira Wind Farm |
Exus Management Partners, S.L |
2018 |
Environment |
Small |
Europe |
Spain |
Simplified environmental impact assessment of a sludge management plant in Madrid |
FERTILIZANTES MARTÍN, S.A |
2018 |
Environment |
Small |
Europe |
Spain |
Preparation of studies and complementary reports requested in the simplified environmental impact assessment process of a sludge treatment facility in the municipality of Getafe (Madrid) |
FERTILIZANTES MARTÍN, S.A |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the legalization of a non-hazardous waste management activity in the province of Segovia |
FOSIMPE, S.L |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental impact study and complementary studies of the "Amplification of El Hierro" Wind Farm (Zamora) |
Gecal Renovables, S.A. (Gecalsa) |
2018 |
Environment |
Small |
Europe |
Spain |
Assistance in the processing of environmental permits for a non-hazardous waste manager in the province of Zaragoza |
GESCRAP ARAGON, S.L.U. |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Impact Assessment and Integrated Environmental Authorization of a WWTP sludge recovery plant and other waste in Dueñas (Palencia) |
GRUPO VALORA GESTIÓN DE RESIDUOS S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the justification of the adaptation to the Best Available Techniques of two poultry farms in the province of León |
Huevos León S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Technical Assistance Services to the Project Management in the environmental supervision of projects, works and start-up of the actions "Sanitation of Vigo" and "New water supply to Pontevedra and its Ría" |
Aguas de las Cuencas del Norte S.A. - acuaNorte |
2018 |
Water |
Small |
Europe |
Spain |
Environmental Assurance Plan and environmental monitoring of the "CABEZÓN DE PISUERGA OUTLET AND WASTEWATER TREATMENT STATION AND CANAL DE CASTILLA ACTIVITIES AREA" |
Arcor Construcciones |
2018 |
Water |
Small |
Europe |
Spain |
Drafting of the Simplified Environmental Impact Study for the Environmental Impact Assessment of the Residential Partial Plan of the Homogeneous Area AH-1 of the Municipality of Valladolid |
ARKIPOLIS ARQUITECTURA Y URBANISMO, S.L.P |
2018 |
Environment |
Small |
Europe |
Spain |
Technical Assistance for the adaptation of the Environmental Management System of the Ponferrada City Council to the ISO 14001:2015 standard |
Ayuntamiento de Ponferrada |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance for carrying out the internal audit and updating the SGMA of the Ponferrada City Council |
Ayuntamiento de Ponferrada |
2018 |
Environment |
Small |
Europe |
Spain |
Permanent Environmental Technical Assistance to a company in the waste sector in the province of Valladolid |
BEFESA ALUMINIO S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Risk Assessment and calculation of the financial guarantee of a manager of hazardous and non-hazardous waste in the province of Valladolid |
BEFESA ALUMINIO S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance in updating and renewing the authorization of a waste manager in the province of León |
Chatarras Jesús Pérez Rodríguez, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the extension of the authorization of a waste manager in the province of Palencia |
CHATELAC, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
DEVELOPMENT OF TOOLS FOR MEASUREMENT, CONTROL AND MANAGEMENT OF STATISTICAL INFORMATION FOR CONSTRUCTION AND DEMOLITION WASTE |
Consejería de Fomento y Medio Ambiente (JCyL) - D.G. Calidad y Sostenibilidad Ambiental |
2018 |
Environment |
Small |
Europe |
Spain |
Study on the biowaste generation rates of large producers and make a first estimate on biowaste production |
Consejería de Fomento y Medio Ambiente (JCyL) - D.G. Calidad y Sostenibilidad Ambiental |
2018 |
Environment |
Small |
Europe |
Spain |
Expansion of an authorized end-of-life vehicle treatment center in the province of Burgos |
Jose Mª Hernando Cantalejo |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Risk Analysis of a wood panel factory in Burgos |
KRONOSPAN, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Technical Assistance for the processing of the communication of initiation of a pharmaceutical industry in León |
Laboratorios Calier, S.A. |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance in the processing of environmental permits for an extension of the manager authorization, in Alcalá de Henares (Madrid). |
LASERCART MADRID, S.L |
2018 |
Environment |
Small |
Europe |
Spain |
Study of cumulative and synergistic effects in the environment of the 169 MW photovoltaic solar plant project in the tt.mm. from Valverdejo, Olmedilla and Alarcón (Cuenca) |
OLMEDILLA HIVE, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Avifauna study in the surroundings of the 169 MW PV Solar Plant project in the Valverdejo, Olmedilla de Alarcón and Alarcón tms (Cuenca). Field work and collection of official bibliographic data |
OLMEDILLA HIVE, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Study of potential wildlife corridors for the design of a solar plant in the municipalities of Valverdejo, Olmedilla de Alarcón and Alarcón (Cuenca) |
OLMEDILLA HIVE, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Follow-up and report on the reform of the SET Loras - SET Mazuelas overhead line modification project of 132 kv simple circuit / simplex. Section between supports 52-68, located in the municipality of Valle de Valdelucio (Burgos) |
Parque Eólico La Boga, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Assistance in processing the authorization of a non-hazardous waste manager in Castilla y León |
PHS SERKONTEN, S.A.U |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance for the legalization of a waste management facility in the municipality of Venta de Baños (Palencia) |
PLÁSTICOS ARRALONSO, S.L |
2018 |
Environment |
Small |
Europe |
Spain |
Technical assistance to the response to allegations to the Strategic Waste Plan of the Principality of Asturias |
Principado de Asturias - Consejería de Infraestructuras, Ordenación del Territorio y Medio Ambiente |
2018 |
Environment |
Medium |
Europe |
Spain |
Technical Assistance in the preparation of the necessary documentation for the Administration of a Non-Hazardous Waste manager in San Andrés del Rabanedo (León) - 2017 |
Productos Residuales C. Peláez, S.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Base status report of the MAPRU service station in Villarramiel. (Palencia) |
Prudencio y Ruth Herrero Ibañez C.B. |
2018 |
Environment |
Small |
Europe |
Spain |
Environmental Technical Assistance for a manager of end-of-life vehicles (VFU) and waste electrical and electronic equipment (WEEE) in the province of Salamanca 2017. |
RECUPERACIONES GARCÍA MORENO, S.R.L. |
2018 |
Environment |
Small |
Europe |
Spain |
Teaching of the Technician Course in Environmental Impact Assessment within the Master in Environmental Management in the Company 2017-2018 |
Instituto Superior Medio Ambiente, S.L. (ISM) |
2018 |
Environment |
Small |
Europe |
Albania |
Albania: Capacity Building for Hydropower and Renewable Energy Investment |
Ministry of Energy and Industry (MoEI) |
2017 |
Energy |
Medium |
Europe |
Bosnia and Herzegovina |
Preparation of the long-term electricity price forecasts for wind power plants |
Private Entity |
2017 |
Management Consulting |
Small |
Europe |
Bulgaria |
Bulgaria and Croatia long-term price forecasting |
Private Entity |
2017 |
Management Consulting |
Large - Multiannual |
Europe |
Bulgaria |
Bulgarian Electricity Long Term Price Update |
Private Entity |
2017 |
Management Consulting |
Small |
Europe |
Finland |
Intelligent Power Solutions in Aland for CLIC Innovation |
Private Entity |
2017 |
Management Consulting |
Small |
Europe |
Serbia |
Wind power plants Podvelezje and Plocno Preparation of the long-term electricity price forecasts |
International Finance Corporation (IFC) |
2017 |
Energy |
Small |
Europe |
Slovenia |
Proposal letter for Services Review of Estimated Level of Effort and Costing for SG Activities within NEDO Project |
Private Entity |
2017 |
Management Consulting |
Small |
Europe |
Slovenia |
Strategy Assessment for Battery Storage Implementation Business Model, as part of NEDO Phase-2 Project |
Private Entity |
2017 |
Energy |
Small |
Europe |
Spain |
Development of an in-house Solar Resource Assessment software 01/03/2016 |
Private Entity |
2017 |
Energy |
Small |
Europe |
Spain |
Review of the technical report for the acquisition of 7 photovoltaic plants in Spain |
Private Entity |
2017 |
Energy |
Small |
Europe |
Spain |
Technical Consultancy Services for ENDESA |
Private Entity |
2017 |
Energy |
Small |
Europe |
Spain |
Turnkey solution for Adaptation of PV plants to LVRT response.
HT-42 Malagón |
Private Entity |
2017 |
Energy |
Small |
Europe |
Spain |
Yield Assessment for two (80 MW and 20 MW) PV Plants |
Private Entity |
2017 |
Energy |
Small |
Europe |
Spain |
Corrective maintenance Alanzar |
Naturener Solar Alange, S.L. |
2017 |
Energy |
Small |
Europe |
Spain |
RENOVACIÓN CERTIFICACIÓN P.O.12.3. ENERSOL |
ENERSOL PROYECTOS, S.L. |
2017 |
Energy |
Medium |
Europe |
Spain |
Turnkey solution for Adaptation of PV plants to LVRT response. HT-42 Malagón |
JB Solar Malagón, S.L. |
2017 |
Energy |
Small |
Europe |
Spain |
Solicitud de acceso a red (Iberdrola) |
Aleph Capital |
2017 |
Energy |
Medium |
Europe |
Spain |
RENOVACIÓN CERTIFICACIÓN P.O.12.3. ARSOL |
ARSOL ENERGÍAS LIMPIAS, S.L. |
2017 |
Energy |
Small |
Europe |
Spain |
RENOVACIÓN CERTIFICACIÓN P.O.12.3. FONTÍVEROS |
Parque Solar Fontiveros Sur, C.B. |
2017 |
Energy |
Small |
Europe |
Spain |
RENOVACIÓN CERTIFICACIÓN P.O.12.3. LANGA |
PARQUE SOLAR LANGA FV, C.B. |
2017 |
Energy |
Small |
Europe |
Spain |
Assistance in the legalization of a biodegradable organic waste treatment plant in the Campo de Villavidel tm, León |
SENSAGRO, S.L. |
2017 |
Environment |
Small |
Europe |
Spain |
Permanent Environmental Assistance Service to an authorized manager of non-hazardous waste from Zamora |
Ibar Ganado López |
2017 |
Environment |
Small |
Europe |
Spain |
Environmental technical and administrative assistance for a waste manager in Valladolid - 2017 |
RECSO Reciclados Sostenibles, S.L. |
2017 |
Environment |
Small |
Europe |
Spain |
AAI review for the installation of a biomass plant in the Teixeiro industrial estate, Curtis (A Coruña) adapting it to the new Execution Project, analysis of modifications, proposal of changes, format adjustments and non-technical summary. |
Renova Generación de Energías Renovables, S.L. |
2017 |
Environment |
Small |
Europe |