720 MW Wind Project in Spain

Site Assessment and Permitting Process of 23 wind farms

We provided technical assistance as Owner’s Engineer in the permitting stage by generating all technical documents required for approval process, including the basic design. First of all we worked on selecting the meteorological mast location for measurement campaigns, which then were taken into account in the wind resource assessment of the wind farms (wind measurement analysis, wind data treatment, filtering, conversion, wind data quality check and reporting). The site assessment was carried from the technical and environmental points of view. We also performed the wind yield assessment.

  • 720 MW Wind Power in Spain
  • Permitting process
  • Basic design
  • Meteorological Mast Location
  • Wind Resource and Energy Yield Assessment
  • Wind Farm Site Assessment