FS of PV Plant in Bosnia & Herzegovina

The objective of the Project was the feasibility study of a grid connected utility scale PV Power Plant in Bosnia and Herzegovina, with overall installed power of around 50 MWp.

The scope of works included the general description of technology, after overviewing the market, and the site assessment relating to solar resource, flooding risk, land availability, access, infrastructures and grid connection.

MAI performed the PV plant configuration and reviewed the grid connection and integration systems, along with the operation and maintenance (O&M) strategy. On the other hand, MAI carried out the permitting assessment, environmental and social impact assessments, CAPEX/OPEX estimation, and review of the financial and commercial risks.