The works included a first review of the request for qualification documents, the minimum functional specifications, the contracts as the power purchase agreement (PPA), and other tender documents. Secondly, MAI was involved in the preparation and review of the technical proposal for the EPC contractor.
In addition, MAI optimized the plant from technical and economic points of view, estimated the CAPEX/OPEX and carried out a bankable estimation of energy yield based on the final plant configuration and the basic engineering design.