mai-logo

Master Plan for the Distribution System and Losses Reduction Study in Dominican Republic

Goals:

  • Timing: April to December 2017.
  • Financing: IADB.
  • CLIENT: CDEEE
  • Beneficiaries: EDENORTE, EDEESTE, EDESUR.
  • Impacted Population: 2.2 Millions of clients.

Public distribution companies

The project was done for all the public distribution companies in Dominican Republic and includes two stream works:

  1. Stream works 1 – Master Distribution Plan: Perform the studies to define the strategy of renovation and expansion in the short, med and long-term to ensure the safety of supply and the quality standards of the service.
  2. Stream work 2 – Losses Reduction Study: Analyze since the technical, social and economic view the previous and current programs of losses reduction, asses their capacity to be implemented in a big scale and propose an integral strategy of losses recovery.

Contact us.

Please feel free to contact us for any request or information.

Luis Cases

Networks Director


    Germán Nieto

    Head of Transmission


      en_GB